My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1994-2010
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
STOCKTON
>
239
>
2300 - Underground Storage Tank Program
>
PR0231482
>
COMPLIANCE INFO 1994-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2018 4:57:02 PM
Creation date
9/12/2018 4:47:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO 1994-2010
FileName_PostFix
1994-2010
RECORD_ID
PR0231482
PE
2361
FACILITY_ID
FA0000720
FACILITY_NAME
MADSENS SUNRISE DAIRY
STREET_NUMBER
239
Direction
S
STREET_NAME
STOCKTON
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
25927805
CURRENT_STATUS
02
SITE_LOCATION
239 S STOCKTON ST
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL HEALTH DEPARTMENT <br />SAN JOAQUIN COUNTY <br />c <br />17 Donna K. Heran, RE.H.S. Unit Supervisors <br />Director 304 East Weber Avenue, Third Floor Carl Borgman, R.E.H.S. <br />gg' <br />Mike Hu ns, R.E.H.S., R.D.I. <br />Al Olsen, RE.H.S. Stockton, California 95202-2708 <br />•c, '�• ProgramManaDouglas W. Wilson, R.E.H.S. <br />9�ji Olk ger Telephone: (209)468-3420 Margaret La olio, R.E.H.S. <br />Laurie A. Cotnua, RE.H.S. <br />Program Manager Fax: (209) 464-0138 Robert McClellon, R.E.H.S. <br />Mark Barcellos, R.E.H.S, <br />December 10, 2004 <br />Donlee Pump Company <br />2825 Railroad Ave <br />Ceres CA 95307 <br />Re: Madsen's Sunrise Dairy, 239 S. Stockton St., Ripon CA <br />The permit application to replace the spill containment and drop tube with overfill flapper <br />on the unleaded 87 and spill containment on the diesel underground storage tank system <br />from the above referenced facility has been approved with the following conditions: <br />1. Contact the San Joaquin Valley Air Pollution Control District and local Fire <br />Department for all necessary permits if applicable. <br />2. The installation must follow the manufacturers instructions. <br />3. EHD must witness a measurement of the drop tubes to determine 95% shutoff for <br />overfill protection. <br />4. Do not backfill around the spill containment and riser until corrosion protection <br />has been verified by an inspection. <br />5. EHD must witness the testing of the spill containment with water for 30 minutes. <br />6. A site health and safety plan must be available onsite for review during <br />construction. <br />7. Tanks must be tested once concrete is poured and the results must be submitted to <br />our office within seven days of testing. <br />8. If work extends into January 2005, a person with the contractor listed on the <br />permit must possess a International Code Council "UST Installation/Retrofitting" <br />certification number and remain on the jobsite during the course of the <br />construction. <br />Schedule all appointments 48 hours in advance. <br />This permit expires on March 10, 2005. <br />If you have any questions please contact me at (209) 468-9848. <br />Thank you, <br />Ray von Fliie, Senior R.E.H.S. <br />Senior Registered Environmental Health Specialist <br />
The URL can be used to link to this page
Your browser does not support the video tag.