Laserfiche WebLink
S <br />i <br />Phase I Vapor Recovery System <br />Manufacturer <br />v <br />CARB Executive Order Number: <br />vw —lO. <br />CARB Executive Order Number: <br />The proposed piping configuration is found in page <br />o6+7 <br />Exhibit <br />I Manufacturer <br />of Executive Order <br />Nozzle <br />Coaxial Hose <br />eA <br />Component <br />Manufacturer <br />Model Number <br />Spill Containment Bucket (Product)�� <br />Spill Containment Bucket (Vapor) <br />Debris Bucket (Product) <br />Debris Bucket (Vapor) <br />N <br />Rotatable Adaptor (Product) <br />I <br />Rotatable Adaptor (Vapor) <br />`✓ <br />Q s _ <br />Drop Tube <br />0 <br />6-1-0— <br />Dust Cap (Product) <br />�OCJ <br />6 —/ 7 <br />Dust Cap (Vapor) <br />�r [f! <br />I17 1 / 7 TG ,Oe: � <br />Pressure/Vacuum Vent Valve <br />Extractor Fitting <br />-- <br />Ball Float Vent Valve <br />IUIA <br />Additional Equipment Not Listed Above <br />i <br />I <br />Phase Il Vapor Recovery System i <br />Manufacturer: <br />System Type: <br />❑ Balance ❑ Vacuum Assist ❑ Burner it <br />CARB Executive Order Number: <br />Component <br />I Manufacturer <br />Model Number <br />Nozzle <br />Coaxial Hose <br />eA <br />Breakaway Fitting <br />Dispenser <br />i <br />Additional Equipment Not Listed Above <br />