My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL 1993
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
STOCKTON
>
239
>
2300 - Underground Storage Tank Program
>
PR0231482
>
REMOVAL 1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2018 5:03:19 PM
Creation date
9/12/2018 4:56:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL 1993
FileName_PostFix
1993
RECORD_ID
PR0231482
PE
2361
FACILITY_ID
FA0000720
FACILITY_NAME
MADSENS SUNRISE DAIRY
STREET_NUMBER
239
Direction
S
STREET_NAME
STOCKTON
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
25927805
CURRENT_STATUS
02
SITE_LOCATION
239 S STOCKTON ST
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN COUNTY <br />COMMUNITY DEVELOPMENT DEPARTMENT <br />1810 E HAZELTON AVE. STOCKTON. CA 95205 <br />DEVELOPMENT SERVICES PHONE 1209) 468.3120 <br />PLANNING PHONE (209) 468-3120 <br />BUILDING PHONE 1209) 468.3123 <br />NEIGHBORHOOD PRESERVATION PHONE (209) 468.3021 <br />e <br />BACKFILL EXCAVATION CERTIFICATE <br />Project Location M a n6� rJ <br />Owner L -ez- Phone No. 1 (2,- (,-,43 4 - 43gD <br />Contractor \2�P� 1 il0n> T. Phone No.,Z�g_ (�(.�-6203License NoIA - SL&e1q 1a <br />INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br />1. Submission of Soil Engineer's Compaction Report within 30 days of project <br />completion, or <br />2. Submission of verification, e.g. load ticket, within 30 days of project <br />completion that one of the following materials was placed in the excavation in <br />12" lifts: <br />A. Pea gravel - smooth, rounded material not more than one-half (1/2) <br />inch in diameter. <br />B. Crushed rock - self -compacting material not more than three-quarters <br />(3/4) inch in cross sectional measurement. (Use of crushed rock <br />will not be permitted for backfill if contact will be made between <br />the backfill material and tanks/pipes made of poly resin glass or <br />similar materials.) <br />DECLARATION <br />I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 days <br />of project completion, or submission of verification that the select material described above <br />will be placed at a minimum of five (5) cubic yards per 1000 gallon tank displacement and <br />that the entire excavation will be backfilled and compacted to insure compliance with the <br />Uniform Building Code Appendix Chapter 70. <br />* Toy,J �olJ�s <br />Name (Print) <br />V i N � <br />Title (Print) <br />* C <br />' natu <br />* Shall be the responsible managing employee on the license or authorized <br />agent. <br />6/91-LC/BECERT.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.