Laserfiche WebLink
8. a. Describe the method that will be utilized to purge and/or inert the tank(s): <br />A <br />b. Tank/Piping Hauler: <br />Name 12) o `t C'�t.r'O�I'�w� <br />Address U, A> V � `�`� City/owl Zip <br />Phone No.( a CJ g) 6 6e — 2� 3 e <br />Hauler Registration #—(if hauled as hazardous) <br />C. Tank/Piping Disposal Site: <br />M. <br />Phone <br />0 <br />zip 2,", <br />EPA HNl (if transported to a permitted TSD facility) <br />7 ' A '7 17 1 / I I _ _ ( . u 1 <br />9. Is the sampling firm an independent third party from the contractor? YES [yr NO [ ] <br />9a. Describe, in detail, ow the soil and/or water <br />sampl s) beneath the tank and piping will be obt �' ed, <br />u t De <br />k <br />10. Describe how the excavation will be backfilled with suitable material upon removal: <br />S Ce, //" // nn <br />1 I. Handling of excavated soil: <br />a) What material will be used to line the tank pit and cover the stockpile? <br />b) What will be the fmal destination of the excavated stockpile? 10.1 &IC /* # e.Xc o�cirt'� 9ra-. <br />c) Contaminated Soil Hazardous Waste Hauler: <br />Name_ 7A F% Hauler Registration <br />Phone No. <br />EH 23 046 (Revised 07/31/09) 5 <br />