My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
9484
>
2900 - Site Mitigation Program
>
PR0518418
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2018 2:56:04 PM
Creation date
9/13/2018 2:50:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0518418
PE
2951
FACILITY_ID
FA0013896
FACILITY_NAME
WLM
STREET_NUMBER
9484
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09055063
CURRENT_STATUS
01
SITE_LOCATION
9484 WEST LN
P_LOCATION
01
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ground Zero Analysis, Inc. <br />SITE SAFETY PLAN <br />On-site communications: ❑ Radio <br />❑ Other <br />x Verbal ❑ Hand Signals <br />Designate hand signals here: <br />Off-site communications: ❑ Radio K Telephone <br />❑ Other <br />The specific signal for an emergency is: Verbally Given <br />The specific signal for an evacuation is: Verbally Given <br />Evacuation assembly point is: To be determined on-site prior to beginning work activities. <br />MARK EVACUATION ROUTE(S) ON SITE MAP O CHECK WHEN DONE <br />SANITATION AND DECONTAMINATION <br />Personnel Decontamination Procedure: All contaminated personal protective equipment (i.e., gloves, <br />coveralls) will be placed on and covered with 6 -mil <br />plastic sheeting along with the excavated soil. <br />Location of Wash Water. Site Building <br />Location of Toilet.- Site Building <br />Location of Drinking Water. Site Building <br />MARK LOCATION OF EYEWASH AND SHOWER DRENCH ON SITE MAP O CHECK WHEN <br />DONE <br />Equipment Decontamination Procedure: Equipment will be washed with a trisodium phosphate <br />solution and/or steamcleaned. <br />Materials to be Disposed of as Hazardous Waste: All soil and water produced will be stored on- <br />site until appropriate disposal methods are <br />determined. <br />PAGE <br />
The URL can be used to link to this page
Your browser does not support the video tag.