Laserfiche WebLink
1534 Willow Pass Road, Pittsburg, CA 94565-1701 <br />�— )' _� M c C a m p b e I I A n a I yt i c a I, Inc. Toll Free Telephone: (877) 252-9262 / Fax: (925) 252-9269 <br />1% 'When Quality Counts" http://www.mccampbeH.com / E-mail: main@mccampbell.com <br />WORK ORDER SUMMARY <br />Client Name: FREMOUW ENVIRONMENTAL SERVICES, INC. Project: TBD; Profleet Inc <br />Client Contact: Dina Barron <br />Contact's Email: dbarron@hazwasteremoval.com; Comments: <br />prapozo@hazwasteremoval.com; <br />Work Order: 1808241 <br />QC Level: LEVEL 2 <br />Date Logged: 8/6/2018 <br />NOTES: - STLC and TCLP extractions require 2 days to complete; therefore, all TATs begin after the extraction is completed (i.e., One -day TAT yields results <br />in 3 days from sample submission). <br />- MAI assumes that all material present in the provided sampling container is considered part of the sample - MAI does not exclude any material from <br />the sample prior to sample preparation unless requested in writing by the client. <br />Page 1 of 1 <br />Page 12 of 14 <br />ElWaterTrax <br />❑WriteOn EDF <br />E] Excel ❑Fax W Email <br />❑HardCopy OThirdParty <br />E]J-flag <br />Lab ID <br />Client ID <br />Matrix <br />Test Name <br />Containers Bottle & Preservative <br />De- <br />Collection Date <br />TAT Sediment <br />Hold SubOut <br />/Composites <br />chlorinated <br />& Time <br />Content <br />1808241-OOIA <br />Prolnc-A-2 <br />Soil <br />SW8015B (Diesel & Motor Oil) <br />1 Stainless Steel tube 2"x6" <br />F� <br />8/3/2018 11:22 <br />5 days <br />0 <br />SW6020 (CAM 17) <br />El <br />5 days <br />0 <br />1808241-002A <br />Prolnc-B-2 <br />Soil <br />SW8015B (Diesel & Motor Oil) <br />I Stainless Steel tube 2"x6" <br />❑ <br />8/3/2018 11:26 <br />5 days <br />SW6020 (CAM 17) <br />❑ <br />5 days <br />❑ <br />1808241-003A <br />Prolne-C-2 <br />Soil <br />SW8015B (Diesel & Motor Oil) <br />1 Stainless Steel tube 2"x6" <br />8/3/2018 11:30 <br />5 days <br />SW6020 (CAM 17) <br />5 days <br />NOTES: - STLC and TCLP extractions require 2 days to complete; therefore, all TATs begin after the extraction is completed (i.e., One -day TAT yields results <br />in 3 days from sample submission). <br />- MAI assumes that all material present in the provided sampling container is considered part of the sample - MAI does not exclude any material from <br />the sample prior to sample preparation unless requested in writing by the client. <br />Page 1 of 1 <br />Page 12 of 14 <br />