My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2017 PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
2758
>
2300 - Underground Storage Tank Program
>
PR0541416
>
INSTALL 2017 PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2022 3:55:06 PM
Creation date
9/19/2018 9:47:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL 2017 PLANS
FileName_PostFix
2017 PLANS
RECORD_ID
PR0541416
PE
2351
FACILITY_ID
FA0023733
FACILITY_NAME
Sunwest Chevron
STREET_NUMBER
2758
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
Ln
City
Lodi
Zip
95242
APN
16646031
CURRENT_STATUS
01
SITE_LOCATION
2758 W Kettleman Ln
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
._ VENT <br />VALVE <br />(SUPPLIED BY <br />INSTALLER) <br />`-VNIMUP, SLOPE <br />1/8" PE:R FOOT, <br />100 FT. MAX. <br />I-.ENGTH <br />-FLOAT CHECK <br />VALVE <br />P/N 9466G <br />OVERFILL <br />PROTECTION <br />BALI_ VALVE <br />LOCKFI) OPEN <br />F__7 OR <br />IN NORMAL <br />OPERATION <br />BALI._ VALVES <br />LOCKED CLOSED <br />E-7171 <br />OR 1711-71 <br />IN NORMAL <br />OPERATION <br />BAIL VALVE <br />LOCKED CLOSED <br />L_P ]ORc_�_:� <br />IN NORMAL <br />OPERATION <br />AIR BREATHER <br />ASSEMBLY <br />P/N 9948 <br />12' MINIMUM <br />ABOVE GRACIE <br />A f <br />--T TT117--7"1(111 I -` P L U G <br />E <br />PLUG <br />a <br />OUR INSTALLATION 15 SIMILAR TO THIS. WE ONLY HAVE <br />2 VENTS TO CONNECT, 57 UNLEADED AND 9`1 UNLEADED. <br />SEE DETAIL 12/F5.0 <br />Healy Phase II EVR System Including In -Stations Diagnostic (ISL) Systems, Exhibit 1 -VIR-202-N <br />48"0 DOUBLE WALL F.R.P. <br />REDUCINGCONTAINMENT SUMP WITH <br />42' MULTIPMT MANHOLE <br />VENT SUMP <br />SUMP BRINE <br />2" F,G, P <br />SCALE: / "= V-0" <br />BRINE INTERSTITIAL SENtDM__ .._..__.._.....__.._ _ <br />BRINEI.-.____.....v...__.__.....v...__.___.._._.__.___ <br />UNCTl <br />SUMP PENETRATION BOOT <br />/4" CONDUIT FROM ANNULAR <br />SPACEMONITOR JUNCTION <br />/" CONDUIT TO TURBINE— <br />UMP JUNCTION <br />_..._ <br />LINE ......._, _ ._ <br />BRINE TEST PORT WIT14 <br />CONNECTIONHOSE AND A <br />2" BELLxMALE F.R.P..r_-- <br />ADAPTOR <br />EXTRACTOR FITTING -'f <br />WITH sn PLUG AT <br />TOP <br />LIQUID <br />INSTALL AT LOWEST <br />INT TO ENSURE <br />L16XJID DETECTIONAT <br />EARLIEST POSSIBLE <br />MOMENT <br />TANK LEVEL MIT _ <br />m <br />1" MIN. CLR T <br />UMP <br />1,101410 1 <br />ALUMINUM FILL TUBE <br />wl PSHUT OFF DEVICE� INSTALL AT 95%OF TANK OSITIVE <br />ACITY <br />4' ALUMINUM FILL TUBE <br />.77u <br />VENT RISER <br />WITHIN 10' <br />i <br />r i <br />i� <br />r i12 i <br />N. SCALE: <br />�. <br />CONIRAC'TOR: <br />ROFESSIONAL, SE'AI-.S: <br />g�Al <br />1, dl <br />._._...... 1. ^�Y <br />J Nu <br />•.° RAL <br />Ctf� <br />�77TiTTTZ_�(CC <br />ROJFCTNUMBER: 0 PROJECT DATE: <br />16-010.3 11-2-2016 <br />mmmmmmmmmmmmmmmmmmmmmwnwmm <br />{FTEET CONTENTS: <br />ommmmommmommmmmomommmmwowwwo <br />ITE'TNC T.MB . F, <br />R. <br />I1 <br />tr t <br />t <br />R i <br />t tt <br />f <br />ty` <br />VAPOR <br />t ti r <br />t <br />r tt r <br />AIR <br />r tit t <br />tt'i ii <br />r+ <br />��1 <br />rfr jl <br />13 <br />c., <br />t <br />V iJ 1V <br />tt ; <br />� t <br />'rl <br />r li <br />E <br />PLUG <br />a <br />OUR INSTALLATION 15 SIMILAR TO THIS. WE ONLY HAVE <br />2 VENTS TO CONNECT, 57 UNLEADED AND 9`1 UNLEADED. <br />SEE DETAIL 12/F5.0 <br />Healy Phase II EVR System Including In -Stations Diagnostic (ISL) Systems, Exhibit 1 -VIR-202-N <br />48"0 DOUBLE WALL F.R.P. <br />REDUCINGCONTAINMENT SUMP WITH <br />42' MULTIPMT MANHOLE <br />VENT SUMP <br />SUMP BRINE <br />2" F,G, P <br />SCALE: / "= V-0" <br />BRINE INTERSTITIAL SENtDM__ .._..__.._.....__.._ _ <br />BRINEI.-.____.....v...__.__.....v...__.___.._._.__.___ <br />UNCTl <br />SUMP PENETRATION BOOT <br />/4" CONDUIT FROM ANNULAR <br />SPACEMONITOR JUNCTION <br />/" CONDUIT TO TURBINE— <br />UMP JUNCTION <br />_..._ <br />LINE ......._, _ ._ <br />BRINE TEST PORT WIT14 <br />CONNECTIONHOSE AND A <br />2" BELLxMALE F.R.P..r_-- <br />ADAPTOR <br />EXTRACTOR FITTING -'f <br />WITH sn PLUG AT <br />TOP <br />LIQUID <br />INSTALL AT LOWEST <br />INT TO ENSURE <br />L16XJID DETECTIONAT <br />EARLIEST POSSIBLE <br />MOMENT <br />TANK LEVEL MIT _ <br />m <br />1" MIN. CLR T <br />UMP <br />1,101410 1 <br />ALUMINUM FILL TUBE <br />wl PSHUT OFF DEVICE� INSTALL AT 95%OF TANK OSITIVE <br />ACITY <br />4' ALUMINUM FILL TUBE <br />.77u <br />VENT RISER <br />WITHIN 10' <br />i <br />r i <br />i� <br />r i12 i <br />N. SCALE: <br />�. <br />CONIRAC'TOR: <br />ROFESSIONAL, SE'AI-.S: <br />g�Al <br />1, dl <br />._._...... 1. ^�Y <br />J Nu <br />•.° RAL <br />Ctf� <br />�77TiTTTZ_�(CC <br />ROJFCTNUMBER: 0 PROJECT DATE: <br />16-010.3 11-2-2016 <br />mmmmmmmmmmmmmmmmmmmmmwnwmm <br />{FTEET CONTENTS: <br />ommmmommmommmmmomommmmwowwwo <br />ITE'TNC T.MB . F, <br />R. <br />
The URL can be used to link to this page
Your browser does not support the video tag.