Laserfiche WebLink
/ <br />SubporuVA7oinnhix(a/[^L� <br />Ix the 'Ridible ala operatiot al? <br />L" yes '—Jthe vislial ularn, OPCME1011,11? <br />ore all Sensors visually ijl.srLtLC..(cd� rtIllciij)II, <br />e, and cnopir <br />Were all sensors instdiled ut lowest Phil, of secondary Containment ind Poshioned SO t1Tt other c(Illipment will <br />1)01 interfere with their.proptr operation? <br />Q Yes 13 No* If alarins arc relayed to a <br />ff 11 NIA operational? I'01110te monitoring st�tlu",Ts all '�(—,rnmunicatlolls equipment (e -g. modem) <br />M Yes Q No* For pressurized <br />IticallY shut down ir the piping Secondary contail,111Lrit <br />U N/A mointoring system detects a leak, Uls to operate, <br />6�j Positive shot -down? (Check all that apply) Or is electrically discowlectLd? If Yes: which sensors initiate <br />)OSitive shut -down due to leaks and sensor failure/disconnectioll,? a y". El No. <br />YCS U NO* ' For tank systems that "tilize The monitoring sy.qem tile Primary tank overfill wa—ming no <br />-Ir U N/A mechanical overfill prevention valve 6 installed), is th &s <br />A c overfill warning alarin visibJe and audible at tile tank <br />Y.- S* U!"No , Was �i�y i�onitoring equipment replaced? jrym identify speci ic sensors, probes, or other equipmelit replaced <br />/ — and list tile Manufacturer name and inudel for a] I replacement parts ill Section F, below <br />Y,;.,;* Was liqtiid* —fokind inside any secondary cOJI'lairlment systems designed as dry systems? TCheci —all —thI'— <br />Y*,-, C3 1;T Product; [I Water If yes, describe Causes in Section E, below- apply) 11 <br />0- ollitoring �ystem -set-up reviewcd to ensure Proper <br />1) Is? Attach IiZ—able <br />jejencies were or will be corrected <br />Ill Section F bell0w, describe how and when these der <br />E. C�»ommmemts;____ <br />�___ <br />-__�----- —_--_—___ ---__- '__—_.� ---� __--_� —_---- --_--_�--_�_—. '—___—_ ---------__—_-- - <br />r^��z"m <br />ynoln 3v� Tl:JT VVOJ/CT/VT <br />