Laserfiche WebLink
SIR. Equ` ���t: VCheck kiis box if to ag; <br />ng is used only li>r ir;ventor 1 <br />❑ Check this box if no tunicau Ting or SII; equipmc;nt is installed." <br />g� b 5 <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />❑ Yes ❑ No* Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />❑ Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br />❑ Yes ❑ No* Was accuracy of system product level readings tested? <br />❑ Yes ❑ No* Was accuracy of system water level readings tested? <br />❑ Yes ❑ No* Were all probes reinstalled properly? <br />❑ Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H, below, describe how and when these deliciencies were or will be corrected. <br />G. Line Leak (Detectors (LLD): ®/ Check this box if LLDs are not installed. <br />Complete the following checklist: S'aC-7rl0W <br />❑ Yes ❑ No*L3For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br />N/A I <br />(Check all that apply) Simulated leak rate: ❑ 3 g.p.h.; ❑ 0.1 g.p.h ; ❑ 0.2 g.p.h. <br />❑ Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br />❑ Yes ❑ No* Was the testing apparatus properly calibrated? <br />❑ Yes ❑ No* For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />❑ N/A <br />❑ Yes ❑No* <br />L3 N/A For electronic LLDs, does the turbine automatically shut off if the LLD .detects a leak? <br />❑ Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />❑ N/A or disconnected? <br />❑ Yes ❑ No* For electronic LLDs, does the turbine automatically shut off, if any portion of the monitoring system malfunctions <br />❑ N/A or fails a test? <br />❑ Yes ❑ No* For electronic LLDs, have all accessible wiring connections been visually inspected? <br />❑ N/A <br />❑ Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H, below, describe how and when these deficiencieswere or will be corrected. <br />H. Comments: <br />Page 3 of 3 <br />03/01 <br />