My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1988 - 2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
ARMY
>
1624
>
2300 - Underground Storage Tank Program
>
PR0231014
>
COMPLIANCE INFO 1988 - 2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 2:21:43 PM
Creation date
9/20/2018 11:31:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO 1988 - 2006
FileName_PostFix
1988 - 2006
RECORD_ID
PR0231014
PE
2361
FACILITY_ID
FA0003777
FACILITY_NAME
TOYS R US
STREET_NUMBER
1624
STREET_NAME
ARMY
STREET_TYPE
CT
City
STOCKTON
Zip
95206
APN
16334002
CURRENT_STATUS
01
SITE_LOCATION
1624 ARMY CT
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
289
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />DEL -TECH GEOTECHNICAL <br />SUPPORT SERVICES <br />10624 OLIVE AVENUE, OAi3ALLâ– , C L 95381 <br />OFFICE # W9) 847$787 / FAX # (208) 847.7744 <br />CA. CLASS "A" ENGINEEFUNG LIC. # 657366 <br />Imp <br />July 21, 2003 <br />FIELD SERVICES: <br />1) MOBILIZATION / DEMOBILIZATION TO AND FROM THE SITE. (PORT -TO -PORT) <br />2) COORDINATING WITH MANAGEMENT AND SETUP ON -SIGHT. (AS NECESSARY) <br />3.) SAMPLE COLLECTION WILL THEN BE COMPLETED THROUGH THE USE OF SAMPLING RODS OR OUT OF <br />A UNDISTURBED CLOD OF SOIL IN A BACKHOE BUCKET. <br />4) THE SOIL CORE WILL BE SEALED, LABELED AND LOGGED INTO A SAMPLE CHAIN OF CUSTODY, <br />5,) FULL FIELD DECONTAMINATION WILL BE COMPLETED PRIOR TO MOVING TO THE NEXT SAMPLE POINT <br />WITH A TRIPLE WASHING OF ALL SAMPLING EQUIPMENT THAT HAD PREVIOUSLY BEEN IN CONTACT WITH <br />THE SOIL. ADDITIONALLY, ALCONOX SOAP AND CHANGING OF NITRILE GLOVES WILL BE PERFORMED <br />BETWEEN EACH SAMPLE POINT. <br />6) ALL SAMPLES COLLECTED WILL BE LABELED AND LOGGED INTO A LABORATORY SAMPLE CHAIN -OF - <br />CUSTODY. <br />7.) SAMPLES WILL THEN BE STORED IN A ICE CHEST WITH ARTIFICIAL (BLUE ICE) AND ICE, <br />B) UPON COMPLETION OF THE MONITORING EVENT THE SAMPLES WILL BE PREPARED FOR PICKUP BY A <br />LAB. COURIER OR TRANSPORTED TO SHERWOOD LABORATORY TO COMPLETE ALL OF THE <br />PARAMETERS REQUESTED. FOR THIS PROJECT THAT ULD BE TOTAL PETROLEUM HYDROCARBONS <br />"DIESEL AND VOLATILE AROMATICS (B.T.X.E. ) <br />9' WITHIN FIFTEEN WORKING DAYS A COMPUTER GENERATED FIELD SUMMARY REPORT WILL BE <br />FORWARDED WITH ALL SUPPORTING DOCUMENTATION TO THE PROJECT MANAGER. <br />
The URL can be used to link to this page
Your browser does not support the video tag.