My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1988 - 2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
ARMY
>
1624
>
2300 - Underground Storage Tank Program
>
PR0231014
>
COMPLIANCE INFO 1988 - 2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 2:21:43 PM
Creation date
9/20/2018 11:31:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO 1988 - 2006
FileName_PostFix
1988 - 2006
RECORD_ID
PR0231014
PE
2361
FACILITY_ID
FA0003777
FACILITY_NAME
TOYS R US
STREET_NUMBER
1624
STREET_NAME
ARMY
STREET_TYPE
CT
City
STOCKTON
Zip
95206
APN
16334002
CURRENT_STATUS
01
SITE_LOCATION
1624 ARMY CT
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
289
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
=N MONITORING PROCEDURES <br />UNDERGROUND STORAGE TANK MONITORING PROGRAM <br />This monitoring program must be lkept at the UST location at all times. The information on this monitoring <br />program are conditions of the operating permit. The permit holder must notify San Joaquin County <br />Environmental Health Division, phone (209) 465-3420 within 30 days of any changes to the monitoring <br />procedures, unkm required to obtain approval before making the change. <br />Reqaftrd by Sections 2632(d) and 2641(h) CCR <br />Facility Name 'i ic,)v4 <br />Facility Address C, LA tri <br />A. <br />nescnbe the freauemv of performing the monitoring: <br />B. What methods and equipment, identified by name and model, will be used for <br />Piping -- <br />C. Describe the locaticn(s) where the monitoring will be performed (facility plot plan <br />should be attached): <br />D. List the name(s) and dde(s) of the people responsible for performing the monitoring <br />and/or maintaining the equipment: <br />E. <br />Reporting format for monitoring: r- <br />Tula "4 1-cJE-602W) Kt j <br />Piping <br />F. Describe the prevemive maintenance schedule for the monitoring equipment. Note: <br />Maintenance must be in accordance with the manufacturers' maintenance schedule <br />but not less than every L months:C�yc1r- E2&E ;. <br />G. Describe the training necessary for the operation of UST system, including piping, <br />and the monitoring equipment:>r <br />S r"s <br />
The URL can be used to link to this page
Your browser does not support the video tag.