My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1988 - 2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
ARMY
>
1624
>
2300 - Underground Storage Tank Program
>
PR0231014
>
COMPLIANCE INFO 1988 - 2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 2:21:43 PM
Creation date
9/20/2018 11:31:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO 1988 - 2006
FileName_PostFix
1988 - 2006
RECORD_ID
PR0231014
PE
2361
FACILITY_ID
FA0003777
FACILITY_NAME
TOYS R US
STREET_NUMBER
1624
STREET_NAME
ARMY
STREET_TYPE
CT
City
STOCKTON
Zip
95206
APN
16334002
CURRENT_STATUS
01
SITE_LOCATION
1624 ARMY CT
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
289
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NEW UST 'NSTALLATION INSPECTION RE" -RD <br />=ACILITY NAME: y r i/ r ADDRESS: d <br />)WEEPS# TANK##LJ� / O -o / UL# TANK/ ` MODEL/MIITERIAL: <br />:APACITY: / occ ! (J7,eX4 R.E.H.S: <br />INITIAL INSPECTIONS <br />A <br />I <br />3. INSPECTION AND TEST OF SECONDARY CONTAINMENT: HOLIDAY: <br />VACUUM: SOAP: PSI: HRS/MIM: BRINE(LIQUID ANNULAR): OTHER: <br />P <br />N <br />ALL TANKS TO BE INSTALLED AID TESTED IM ACCORDANCE <br />4. PRIMARY TANK TEST: PSI: HRS/MIM: <br />P <br />I <br />WITH MANUFACTURER WRITTEN SPECIFICATIONS <br />5. TANK APPROPRIATELY PLACED WITH APPROVED BACKFILL (CCR 2635 (A) (3) (4) (6)/ API/PEI) <br />R <br />T <br />15. PERFORMANCE TEST OF AUTOMATIC PUMP SYSTEM SHUT-OFF (CCR 2635 (B) (5)) <br />0 <br />I <br />16. BALL FLOAT VALVES INSTALLED (CCR 2635 (B) (6)) <br />Z �l0 SIJ <br />V <br />A <br />17. OVERFILL PROTECTION INSTALLED/APPROVED (CCR 2635 (E) (2)) <br />E <br />L <br />18. TANK ACCESS PORTS BROUGHT TO GRADE (LOCKED AND WATERTIGHT) (CCR 2631 (D) (5)) <br />D <br />S <br />19. TANK INTEGRITY TEST (PASSING HARD COPY) (CCR 2635 (A) (5)) <br />ITEM OR EQUIPMENT INSPECTED <br />DATE <br />21. •C• FORM COMPLETED AND SUBMITTED (CCR 2635 (E)) <br />1. UST PLANS SUBMITTED/ FEES PAID (H+S CODE 25287, CCR 2635 (D) (8) <br />2. UST INSTALLATION PLANS APPROVED (CCR 2635 (E) (5)) <br />INITIAL INSPECTIONS <br />PIPING INSPECTIONS <br />✓ <br />./ 6. PRIMARY PIPING TEST (MINIMUM 40 PSI/30 MIM) 6a%�� U (CCR 2635 (B) (4)) <br />/� <br />3. INSPECTION AND TEST OF SECONDARY CONTAINMENT: HOLIDAY: <br />VACUUM: SOAP: PSI: HRS/MIM: BRINE(LIQUID ANNULAR): OTHER: <br />7. SECONDARY PIPING CONTAINMENT TEST PSI: HRS/MIM: OTHER: (CCR 2635 (A) (4)) <br />tI <br />3. PERFORMANCE TEST OF CONTINUOUS MONITORING SYSTEM (PANEL) (CCR 2632 (A) (2)) <br />4. PRIMARY TANK TEST: PSI: HRS/MIM: <br />9. UNUSED TANK OPENINGS SEALED AND CORROSION PROTECTED (CCR 2635) <br />5. TANK APPROPRIATELY PLACED WITH APPROVED BACKFILL (CCR 2635 (A) (3) (4) (6)/ API/PEI) <br />PIPING INSPECTIONS <br />FINAL INSPECTION <br />6 r�S <br />✓ <br />./ 6. PRIMARY PIPING TEST (MINIMUM 40 PSI/30 MIM) 6a%�� U (CCR 2635 (B) (4)) <br />/� <br />12. PERFORMANCE TEST FOR 'ALL• MONITORING PROBES (CCR 2632 (C) (2)) <br />7. SECONDARY PIPING CONTAINMENT TEST PSI: HRS/MIM: OTHER: (CCR 2635 (A) (4)) <br />tI <br />3. PERFORMANCE TEST OF CONTINUOUS MONITORING SYSTEM (PANEL) (CCR 2632 (A) (2)) <br />8. LAKE TEST ON ALL SUMPS (24 HR. MINIMUM) HRS: (CCR 2635 (A)) <br />9. UNUSED TANK OPENINGS SEALED AND CORROSION PROTECTED (CCR 2635) <br />Z. -t 0 <br />r 1 OVERSPILL PERFORMANCE TEST (CCR 2635 (A) (4)) <br />15. PERFORMANCE TEST OF AUTOMATIC PUMP SYSTEM SHUT-OFF (CCR 2635 (B) (5)) <br />11. ALL PIPING AND FITTINGS CORROSION PROTECTED (CCR 2635 (B)) <br />FINAL INSPECTION <br />6 r�S <br />✓ <br />12. PERFORMANCE TEST FOR 'ALL• MONITORING PROBES (CCR 2632 (C) (2)) <br />V1 <br />tI <br />3. PERFORMANCE TEST OF CONTINUOUS MONITORING SYSTEM (PANEL) (CCR 2632 (A) (2)) <br />14. PERFORMANCE TEST OF LINE LEAK DETECTION (CCR 2632 (D) 2635 (B) (5)) <br />/ <br />15. PERFORMANCE TEST OF AUTOMATIC PUMP SYSTEM SHUT-OFF (CCR 2635 (B) (5)) <br />16. BALL FLOAT VALVES INSTALLED (CCR 2635 (B) (6)) <br />Z �l0 SIJ <br />17. OVERFILL PROTECTION INSTALLED/APPROVED (CCR 2635 (E) (2)) <br />18. TANK ACCESS PORTS BROUGHT TO GRADE (LOCKED AND WATERTIGHT) (CCR 2631 (D) (5)) <br />19. TANK INTEGRITY TEST (PASSING HARD COPY) (CCR 2635 (A) (5)) <br />20. MONITORING PLAN, RESPONSE PLAN AND LOG BOOK ON SITE (CCR 2632 (E) (1) (2)) <br />21. •C• FORM COMPLETED AND SUBMITTED (CCR 2635 (E)) <br />22. MONITORING METHOD FOR ALL TANKS AND PIPING APPROVED (CCR 2641-2644) <br />23. ALL CONDITIONS MET; FACILITY PERMIT ISSUJED (H+S CODE 25284 (E) (F)) <br />COMMENTS: ' " ' r lA tom) s �J LN t3�n i i1/�'b�+C mac. �. eJ <br />EH23-006 3/92 <br />
The URL can be used to link to this page
Your browser does not support the video tag.