Laserfiche WebLink
105 <br />UDC Leak Alarms and Failure/Disconnection are now shown to produce automatic pump shutdown <br />UDC monitoring stops flow of Product at Dispenser is marked NO <br />UDC Leak Sensor Manufacturer now reads "Gilbarco/Veeder Root" <br />UDC Leak Sensor Model now reads "5950000011/208" <br />107 <br />A site plan detailing the various monitoring parts is uploaded into CERS <br />201 <br />We will watch closely for alarms and record the alarms and any follow up actions required. The <br />Designated Operator reviewed the records on site and found the record of the alarm and the cause and <br />corrective action. <br />203 <br />Test Results for 3/17/15, 4/8/16 and 11/15/16 are in the book on site and attached with this write up. <br />We will keep monitoring certification test results on site for at least 3 years. <br />206 <br />A copy of the disposal manifest is attached and we requested another copy of the soil sample results to <br />be emailed to Environmental Health. <br />209 <br />The Designated Operators doing inspections at the sites will review the alarm history and insure that all <br />leak alarms have been noted and addressed. The Designated Operator reviewed the records on site and <br />found the record of the alarm and the cause and corrective action. <br />211 <br />Training log is attached. <br />315 <br />We will work to ensure that all sumps and annular spaces are maintained free of liquid <br />319 <br />The drain valve was replaced and the failure was corrected onsite. <br />