Laserfiche WebLink
Cesar Ruvalcaba [EH] <br /> From: Roberts, Ralph <RPRb@pge.com> <br /> Sent: Wednesday, November 21, 2018 12:23 PM <br /> To: Cesar Ruvalcaba [EH] <br /> Subject: PG&E MCDI Response to NTC issued 10/24/2018 <br /> Attachments: 20181121122000.pdf <br /> Hello Cesar <br /> The updated text to the SPCC has been attached for the portable generator that was incorrectly listed as oil-filled <br /> operating equipment at the Turner Cut Sttion. The unit at Turner Cut was no longer needed as the guard shack was <br /> hard-wired for electric power. Here is the text for the generator at Whisky to show it is indeed identified as bulk <br /> storage. <br /> We had United Rentals replace the containment under the water pump with sturdier supports in the interim. However, <br /> we hope to have a re-purposed concrete berm to provide the required containment for this pump in the next week or <br /> so. I can forward photos when this has been accomplished. <br /> Let me know if this adequately addresses the inspection report. <br /> A <br /> xkoaesa <br /> 4 <br /> 1 <br /> .y <br /> 7 <br /> r <br /> i <br /> r� <br /> Thanks <br /> Ralph Roberts <br /> i <br />