Laserfiche WebLink
80AR0 OF_TRUSTEES <br />James Culbertson, Pres. <br />Palncl• E. Vannuccl, Secy. <br />Anlhonell• Ven Spronsan <br />Earl Plmenlel <br />Fsfn eupbee <br />Daniel L. Flores <br />John 0. Mast, M.D. <br />William J. Wade <br />Mary Anna Love <br />Facility Name <br />SAN JOAQUIN LOCAL HEALTH DISTRICT <br />f <br />1601 Ea3t Hazelton Avenue, P. O. Box 2009 <br />Stockton, California 95201 <br />209/466-6781 <br />Jopl Khanna, M.D., M.P,H., District Health Officer <br />Address <br />Date of Inspection 16 <br />MONITORING ALTERNATIVE .N7 <br />NC - <br />Inspector <br />SERVING <br />City of Lod, <br />Sen Joaquin County <br />City of Eecslon <br />city of Menlac• <br />City of Ripon <br />City of Stockton <br />City of Tracy <br />San Joaquin County <br />Sen Joaquin County <br />Limited to undernround storage tanks which have infrequent inputs and withdrawals and <br />where the liquic: level in the tank can be measured to an accuracy of +5 gallons or less <br />when the tank is half full. <br />This monitoring alternative shall include: <br />Annual precision test on tank and piping. <br />Tank gauging performed as follows: <br />Tank must be capable of bein secured to <br />withdrawals. g prevent unauthorized inputs and <br />Tank must have no inputs or withdrawals for at least a 48 hour period <br />(2 days) at the end of consecutive periods lasting up to 7 days. <br />(For example: tank in use Monday through Friday, then locked <br />✓' over weekend). <br />Liquid level measurements are taken at the beginning and end of the <br />monitoring period (lasting at least 48 hours). <br />(For example: level measured and recorded Friday night before <br />locking and again on Monday morning before opening.) <br />_ If liquid level varies more than 1% of the tank volume or 5 gallons, which <br />ever is less, between measurements, an unauthorized release shall be <br />assumed to have occurred and shall be reported to the local agency within <br />24 hours, as per Article 5, Sect. 2652 of the regulations and further <br />evaluations shall be performed to verify or disprove the variations. <br />Implementation of the monitoring alternative requires that the following circled items be <br />completed by the dates specified. <br />l; Precision test(s) must be performed by /�'and results submitted to this <br />office within 30 days of the test. <br />2) Tank gauging must be started immediately. (See instructions above). <br />If the above compliance dates cannot be met <br />date. <br />4/86 UGT 3 <br />contact this office prior to the specified <br />