My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VALPICO
>
400
>
2800 - Aboveground Petroleum Storage Program
>
PR0528621
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2019 10:25:25 AM
Creation date
9/25/2018 4:01:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0528621
PE
2831
FACILITY_ID
FA0009574
FACILITY_NAME
INTERNATIONAL PAPER
STREET_NUMBER
400
Direction
W
STREET_NAME
VALPICO
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
400 W VALPICO RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN COUNTY <br /> ENVIRONMENTAL HEALTH DEPARTMENT <br /> 600 East Main Street, Stockton, California 95202-3029 <br /> Telephone:(209)468-3420 Fax:(209)468-3433 Web:www.sigov.org/ehd/unitiii.html <br /> CONTINUATION FORM Page: 4 of 4 <br /> OFFICIAL INSPECTION REPORT Date: 09/07/11 <br /> Facility Address: Inland Paperboard & Packaging 400 West Valpico Road. Tracy Program: APSA <br /> SUMMARY OF VIOLATIONS <br /> CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> Routine Aboveground Petroleum Storage Tank inspection report <br /> 517. Copies of the quarterly inspection for the aboveground containers were not found on site. <br /> Inspections and tests must be conducted in accordance with the written procedures developed in the <br /> SPCC Plan. Records of these inspections and tests must be signed by the appropriate supervisor or <br /> inspector and kept on site with the SPCC Plan for a period of three years. Immediately begin conducting <br /> the quarterly inspection, locate any copy of all inspection and testing records for the last three years, and <br /> maintain them on site. <br /> 518 (2). This facility does not have a designated person for discharge prevention. The SPCC Plan shall <br /> designate a person at the facility who is accountable for discharge prevention and who reports to facility <br /> management. Immediately designate a person to be accountable for discharge prevention and update <br /> the SPCC Plan to include this information. <br /> 513. The Plan lacks description of equipment failure for above ground containers/ equipments. <br /> Discharge & drainage controls and potential equipment failure are not addressed for any of the unlisted <br /> containers. The SPCC Plan must include the correct type of oil and storage capacity of each fixed <br /> storage container, and either the type of oil and storage capacity of each portable container or an <br /> estimate of the potential number of portable containers, types of oil, and anticipated storage capacities. <br /> The Plan must include discharge or drainage controls, such as secondary containment around all <br /> containers and other structures, equipment, and procedures for the control of a discharge, and a <br /> prediction of the direction, rate of flow, and total quantity of oil which could be discharged as a result of <br /> each type of major equipment failure. Immediately update the discharge information in the SPCC Plan <br /> to accurately represent the petroleum storage at the facility. <br /> 519. 49. The SPCC Plan did not include discussion of adequate security lighting. The Plan must include <br /> descriptions of how you secure and control access to the oil handling, processing & storage areas, <br /> secure master flow & drain valves, prevent unauthorized access to starter controls on oil pumps, secure <br /> out-of-service and loading/unloading connections of oil pipelines, and address the appropriateness of <br /> security lighting to both prevent acts of vandalism and assist in the discovery of oil discharges. <br /> Immediately update the Plan to include all of the required security information. <br /> Submit to SJC EHD within 30 days (10/7/11): <br /> 1. one copy of the completed "Return to Compliance Certification" form <br /> 2. a written corrective action statement for each of the above violation <br /> Do not submit a copy of the SPCC Plan to EHD. It will be reviewed again during next inspection <br /> ALL EHD STAFF TIME ASSOCIATED WITH FAILING TO COMPLY BY THE ABOVE NOTED DATES WILL BE BILLED AT THE CURRENT HOURLY RATE. <br /> THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br /> EHD Inspector: Reuived By: Title: <br /> Thuy Tran (209) 468-8257 <br /> EHD 23-02-003 Rev 07/12/11 CONTINUATION FORM <br />
The URL can be used to link to this page
Your browser does not support the video tag.