My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
640
>
2900 - Site Mitigation Program
>
PR0529779
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2018 11:38:00 AM
Creation date
9/26/2018 11:15:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0529779
PE
2960
FACILITY_ID
FA0019644
FACILITY_NAME
FORMER GENE GABBARD INC
STREET_NUMBER
640
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13906004
CURRENT_STATUS
01
SITE_LOCATION
640 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GROUND ZERO ANALYSIS, INC. <br /> 1714 Main Street <br /> Escalon, California 95320-1927 <br /> Telephone: (209) 838-9888 RECLE <br /> Facsimile: (209) 838-9883 U <br /> April 18, 2003 APR 2 2 2003 <br /> ENVIRONMENT HEALTH <br /> Ms. Lori Duncan PERMIT/SERVICES <br /> San Joaquin County Public Health Services <br /> Environmental Health Division <br /> 304 East Weber Avenue, Third Floor <br /> Stockton, CA 95202 <br /> Subject: Drilling Permit Application <br /> 640 N. El Dorado Street, Stockton, California <br /> Dear Ms. Duncan: <br /> Enclosed herewith are completed drilling permit applications and the associated fee to drill and <br /> sample three pilot borings to a depth of 50 feet using a direct push drilling rig, and to drill and install <br /> three groundwater monitoring wells at the subject site. <br /> We have tentatively scheduled to drill the pilot borings on May 6, 2003 and install the monitoring <br /> wells on May 22 and 23, 2003. <br /> In addition to the scheduled drilling, Ground Zero has ordered a passive skimmer to install in well <br /> MW3. The skimmer should be delivered during the week of April 21, 2003 and will be installed <br /> shortly thereafter. A planned free-product recovery pump test has been postponed because the <br /> water levels in site wells have declined to levels below the desired groundwater elevation for the <br /> test. <br /> Please feel free to call me or John Lane at(209) 838-9888 if you have any questions. <br /> Respectfully, <br /> iTir� <br /> Staff Geologist <br /> Enclosures: Drilling Permit Application <br /> Ck#OIZ,- S ($89.00) <br /> cc: Mr. Patrick D. Riddle, Esq. <br />
The URL can be used to link to this page
Your browser does not support the video tag.