Laserfiche WebLink
NEW UST IN&LLATION INSPECTION RECOR^ <br /> FACILITY NAME: U J/.. i.., �_�� '�'n� ADDRESS: <br /> �! <br /> S4EEP53 � MTE? ( RIAL: - <br /> 1 p <br /> CAPACITY: �r1 , C)/) div l PRODUCT:� L. UL L, Llv R.E.N.S: <br /> A I <br /> P N ALL TANKS TO BE INSTALLED AMD TESTED IN ACCORDANCE -Li'Ih✓ ���"' - <br /> P I WITH MANUFACTURER WRITTEN SPECIFICATIONS \ <br /> R T <br /> V A 3 l <br /> E L l! dt <br /> 0 S <br /> ITEM OR EDUIPMEMT INSPECTED L'oo NL Al <br /> GATE _ <br /> at1. UST PLANS SUBMITTED/ FEES PAID (H+S CODE 25287, CCR 2635 (D) (8) <br /> 2. UST INSTALLATION PLANS APPROVED (CCR 2635 (E) (5)) <br /> INITIAL INSPECTIONS <br /> 3. INSPECTION AND TEST OF SECONDARY CONTAIMM)IT: HOLIDAY: <br /> VACUUM: SOAP: PSI: HRSMIN: BRINE(LIDUID AMNULAR):1 ` OTHER: <br /> 4. PRIMARY TANK TEST: )5, F Ji,y PSI: HRSMIN: % O J7GLYt,I <br /> TLTi37 5. TANK APPRCPR IATELT PLACED Y H APPROVED BACKFILL (CCR 2635 (A) (3) (4) (6)/ API/PEI) <br /> PIPING INSPECTIONS <br /> 6. PRIMARY PIPING TEST (MINIMUM 40 PSI/30 MIN) (o P!9-T y5 i`7' (CCA 2635 (8) (4)) <br /> 7. SECOMDARY PIPING CONTAINMENT TEST PSI:S5 HRSMIM: 7L OTHER: (CCR 2635 (A) (4)) <br /> lu <br /> -55,-Y'� / 8. LANG: TEST ON ALL SUMPS (24 HR. MINI") NRS: , ) `7 (CCR 2635 (A)) <br /> Cf_4j v/ 7D 9. UNUSED TANK OPENINGS SEALED AND CORROSION PROTECTED ^ / (CCR 2635) <br /> 10. OVERSPILL PERFORMANCE TEST (CCR 2635 (A) (4)) <br /> 11. ALL PIPING AND FITTINGS CORROSION PROTECTED (CCR 2635 (B)) <br /> FINAL INSPECTION <br /> (g 12. PERFORMANCE TEST FOR 'ALL* MONITORING PROBES (CCR 2632 (C) (2)) <br /> .aC6� 13. PERFORMANCE TEST OF COITINUCUS MONITORING SYSTEM (PANEL) (CCR 2632 (A) (2)) <br /> 14. PERFORMANCE TEST OF LINE LEAK DETECTION (CCR 2632 (0) 2635 (B) (5)) <br /> 1_`: 15. PERFORMANCE TEST OF AUTOMATIC PUS SYSTEM SHIT-OFF R--arS'k3 (CCR 2635 (B) (5)) <br /> 6. BALL FLOAT VALVES INSTALLED (CCR 2635 (B) (6)) <br /> .d�lQ Qz 7. OVERFILL PROTECTION INSTALLED/APPROVED (CCR 2635 (E) (2)) <br /> a0'"t•l L TANK ACCESS PORTS BROUGHT TO GRADE (LOCKED AND WATERTIGHT) (CCR 2631 (D) (5)) <br /> 19. TANK INTEGRITY TEST (PASSING HARD COPY) _3 JA $S (CCR 2635 (A) (5)) <br /> 20. MONITORING PLAN, RESPONSE PLAN OC BOOK ON SITE (CCR 2632 (E) (1) (2)) <br /> ((`!3 121- 'C• FORM COmLETED AND SUBMITTED (CCR 2635 (E)) <br /> _ uu 3 '� 22. MONITORING METHOD FOR ALL TANKS AID PIPING APPROVED (CCR 2641-2644) <br /> 23. ALL COW ITIONS MET; FACILITY PERMIT ISSUED /J (H+S CODE 25284 (E) (F)) <br /> COMMENTS: la �lperr yl <br /> E423-006 3/92 <br />