Laserfiche WebLink
Page 1 of 2 <br /> Stacy Rivera [EH] <br /> From: Mike Eliason [mike.eliason@vpps.net] <br /> Sent: Monday, November 01, 2010 9:26 AM <br /> To: Stacy Rivera [EH] <br /> Subject: Valley Pacific APSA documentation -Tracy <br /> Attachments: APSA RTC Letter 8 10.doc;APSA RTC 8_10.pdf; SPCC Mod Request Letter.docx; Piping <br /> sign.pptx; SPCC Mod Request.pdf <br /> Here is the documentation for the APSA RTC . It should include the RTC letter and form as well as the <br /> documentation I sent the engineer to make the required changes. I also included a powerpoint with the <br /> graphic for the above ground piping sign. I'm including it below in case you do not have powerpoint. <br /> CAUTION <br /> THIS IFACILE <br /> HAS ABOVE <br /> Jux PIPING <br /> USED FOR <br /> ON SITE FUEL <br /> TRANSFER <br /> OPERATIONS <br /> Mike Eliason <br /> Cardlock Manager <br /> 11/3/2010 <br />