Laserfiche WebLink
618 The adequacy of the secondary containment for the onsite loading rack were not available <br /> • The Plan update evaluates the secondary containment for the onsite loading rack. Any <br /> recommended changes will be addressed immediately and completed within 6 months. <br /> 619 The adequacy of the onsite vehicle departure system in the loading area was not discussed <br /> • The new plan addresses the requirements for the onsite vehicle departure system. <br /> Recommended practices and procedures will be implemented and will be included in our driver <br /> training. <br /> 713 The tanks were not integrity tested <br /> • We hired Northwest Tank Lining and Inspection to perform the integrity testing on the tanks. <br /> Initial testing was done on 21 February and we are waiting for the final report. <br />