My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KASSON
>
23100
>
2800 - Aboveground Petroleum Storage Program
>
PR0516434
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2019 8:57:52 AM
Creation date
9/27/2018 11:42:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0516434
PE
2832
FACILITY_ID
FA0010206
FACILITY_NAME
VALLEY PACIFIC PETROLEUM
STREET_NUMBER
23100
Direction
S
STREET_NAME
KASSON
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
23906004
CURRENT_STATUS
01
SITE_LOCATION
23100 S KASSON RD
P_DISTRICT
005
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Joaquin County <br /> Environmental Health Department <br /> 1868 East Hazelton Avenue, Stockton, California 95205-6232 <br /> Telephone:(209)468-3420 Fax:(209)468-3433 Web:www.sigov.org/ehd <br /> Aboveground Petroleum Storage Act Inspection Report <br /> Facility Name: Facility Address: Date: <br /> VALLEY PACIFIC PETROLEUM 23100 S KASSON RD TRACY February 11 2016 <br /> SPCC Plan Requirements for Onshore Facilities (excluding production facilities) <br /> 725 CFR 112.8(d)(3) Failed to design pipe supports to minimize abrasion/corrosion and to allow for expansion/contraction ❑V R ❑COS <br /> 726 CFR 112.8(d)(4) Failed to regularly inspect aboveground valves,piping,and appurtenances n V ❑R ❑COS <br /> 727 CFR 112.8(d)(4) Failed to conduct integrity and leak test on buried piping any time it is worked on n V ❑R n COS <br /> 728 CFR 112.8(d)(5) Failed to adequately warn vehicles entering facility to protect piping and other transfer operations V R COS <br /> Other Violations <br /> 4010 See below Unlisted Administration/Documentation violation ❑V ❑R o COS <br /> 4020 See below Unlisted Training violation ❑V n R n COS <br /> 4030 See below Unlisted Operations/Maintenance violation ❑V u R o COS <br /> 4040 1 See below Unlisted Release/Leaks/Spills violation o V ❑R COS <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS Il,or MINOR-Notice to Comply) <br /> Item# Remarks <br /> 201 CFR 112.3(d) Plan certification by a Professional Engineer(PE)missing or incomplete. <br /> The Professional Engineer(PE)certification is incomplete. The PE Certification is missing a statement"he or his <br /> agent has visited and examined the facility,the Spill Prevention, Control, and Countermeasure(SPCC)Plan has been <br /> prepared in accordance with good engineering practice, including consideration of applicable industry standards, <br /> procedures have been established for required inspections and testing, and the Plan is adequate for the facility." The <br /> PE certification must include all of the aspects in 40 CFR 112.3(d)(1), including attesting that the PE is familiar with <br /> 40 CFR Part 112, he or his agent has visited and examined the facility, the Spill Prevention, Control, and <br /> Countermeasure(SPCC)Plan has been prepared in accordance with good engineering practice, including <br /> consideration of applicable industry standards, procedures have been established for required inspections and testing, <br /> and the Plan is adequate for the facility. Immediately obtain a complete PE certification for the facility's SPCC Plan. <br /> Submit a copy of the completed certification to the EHD. <br /> This is a repeat violation, Class II. <br /> 301 CFR 112.5(a) Failed to amend Plan as necessary. <br /> Page 6 of the reviewed SPCC plan indicated that underground piping at this facility has interstitial monitoring between <br /> the walls, according to Mr. Eliason, no interstitial monitoring is present on the underground piping. The Spill <br /> Prevention, Control, and Countermeasure(SPCC) Plan must be amended when there is a change in the facility <br /> design, construction,operation, or maintenance that materially affects its potential for a discharge,within 6 months of <br /> the change,and implemented as soon as possible, not later than 6 months following preparation of the amendment. <br /> Immediately make all necessary amendments to the SPCC Plan to accurately represent the procedures and policies <br /> currently in place at the facility. <br /> This is a Class II violation. <br /> Page 3 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.