Laserfiche WebLink
San Joaquin County <br /> Environmental Health Department <br /> 1868 East Hazelton Avenue, Stockton, California 95205-6232 <br /> Telephone:(209)468-3420 Fax:(209)468-3433 Web:www.sigov.org/ehd <br /> Aboveground Petroleum Storage Act Inspection Report <br /> Facility Name: Facility Address: Date: <br /> VALLEY PACIFIC PETROLEUM 23100 S KASSON RD TRACY February 11 2016 <br /> SPCC Plan Requirements for Onshore Facilities (excluding production facilities) <br /> 725 CFR 112.8(d)(3) Failed to design pipe supports to minimize abrasion/corrosion and to allow for expansion/contraction ❑V R ❑COS <br /> 726 CFR 112.8(d)(4) Failed to regularly inspect aboveground valves,piping,and appurtenances n V ❑R ❑COS <br /> 727 CFR 112.8(d)(4) Failed to conduct integrity and leak test on buried piping any time it is worked on n V ❑R n COS <br /> 728 CFR 112.8(d)(5) Failed to adequately warn vehicles entering facility to protect piping and other transfer operations V R COS <br /> Other Violations <br /> 4010 See below Unlisted Administration/Documentation violation ❑V ❑R o COS <br /> 4020 See below Unlisted Training violation ❑V n R n COS <br /> 4030 See below Unlisted Operations/Maintenance violation ❑V u R o COS <br /> 4040 1 See below Unlisted Release/Leaks/Spills violation o V ❑R COS <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS Il,or MINOR-Notice to Comply) <br /> Item# Remarks <br /> 201 CFR 112.3(d) Plan certification by a Professional Engineer(PE)missing or incomplete. <br /> The Professional Engineer(PE)certification is incomplete. The PE Certification is missing a statement"he or his <br /> agent has visited and examined the facility,the Spill Prevention, Control, and Countermeasure(SPCC)Plan has been <br /> prepared in accordance with good engineering practice, including consideration of applicable industry standards, <br /> procedures have been established for required inspections and testing, and the Plan is adequate for the facility." The <br /> PE certification must include all of the aspects in 40 CFR 112.3(d)(1), including attesting that the PE is familiar with <br /> 40 CFR Part 112, he or his agent has visited and examined the facility, the Spill Prevention, Control, and <br /> Countermeasure(SPCC)Plan has been prepared in accordance with good engineering practice, including <br /> consideration of applicable industry standards, procedures have been established for required inspections and testing, <br /> and the Plan is adequate for the facility. Immediately obtain a complete PE certification for the facility's SPCC Plan. <br /> Submit a copy of the completed certification to the EHD. <br /> This is a repeat violation, Class II. <br /> 301 CFR 112.5(a) Failed to amend Plan as necessary. <br /> Page 6 of the reviewed SPCC plan indicated that underground piping at this facility has interstitial monitoring between <br /> the walls, according to Mr. Eliason, no interstitial monitoring is present on the underground piping. The Spill <br /> Prevention, Control, and Countermeasure(SPCC) Plan must be amended when there is a change in the facility <br /> design, construction,operation, or maintenance that materially affects its potential for a discharge,within 6 months of <br /> the change,and implemented as soon as possible, not later than 6 months following preparation of the amendment. <br /> Immediately make all necessary amendments to the SPCC Plan to accurately represent the procedures and policies <br /> currently in place at the facility. <br /> This is a Class II violation. <br /> Page 3 of 6 <br />