Laserfiche WebLink
Prime Shine Express Lube SPCC Plan <br /> last revised: 8/3/10 <br /> Contents <br /> • Facility diagram and description of the facility <br /> • Oil discharge predictions <br /> • Appropriate secondary containment or diversionary structures <br /> • Facility drainage <br /> • Site security <br /> • Facility inspections <br /> • Requirements for bulk storage inspections <br /> • Transfer procedures and equipment (including piping) <br /> • Requirement for qualified oil-filled operational equipment <br /> • Loading/unloading rack requirements and procedures for tank trucks <br /> • Personnel training and oil discharge prevention briefings <br /> • Recordkeeping requirements <br /> • Five-year Plan review <br />