Laserfiche WebLink
Starting at the tank and moving towards the dispenser <br /> describe each section of piping on a separate page <br /> Tank# of�— <br /> Z PIPING <br /> PIPING SECTION # 2- of <br /> Describe the placement of the piping: <br /> ❑ Underground 0 Aboveground 0 Floating <br /> lnderwater <br /> ❑ Suspended under dock 0 Above/along side the dock 0 Other <br /> How does the piping adapt to water level fluctuations? <br /> 'ex0 cess flexible piping that is not on hose reel HoOther_ <br /> Reel ❑Unnecessary <br /> M Connected/disconnected manually <br /> Estimated length of this section of piping: <br /> 7"' -50 feet ❑50-150 feet 0 150-250 feet 0 250-350 feet 0 350-500 feet ❑>500 feet <br /> Piping construction: / 0 DW (see glossary of terms for specific definition of DW) <br /> Primary piping: <br /> r. ,ubber Hose ❑ Metallic 0 Non-Metallic Rigid ❑ Non-Metallic Flexible 0 Other <br /> Is the primary piping protected against corrosion? 0 Yes ❑Unknown <br /> o <br /> if so,how? <br /> Secondary piping: 'No Secondary piping <br /> ❑ Rubber Hose ❑ Metallic ❑ Non-Metallic Rigid 0 Non-Metallic Flexible ❑Other <br /> Is the secondary piping protected against corrosion? 0 Yes <br /> C No ❑N/A ❑Unknown <br /> If so,how? <br /> Monitoring <br /> Type of monitoring: <br /> 0 Electronic Frequency�- <br /> 0 Mechanical Frequency <br /> 0 Line Tightness Test Frequency <br /> O Visual Frequency <br /> Location of piping transition point: <br /> )aver water 0 Over land 0 Underwater <br /> Is the piping transition secondarily contained? <br /> ❑Yes IflliNo If so,how? <br /> Comments <br /> 10/23100 <br /> SWRCB <br />