Laserfiche WebLink
� tTI <br /> 11m;inspection revealed 3; MI-1.indreuuun, <br /> I In:II lr t„ 1 1 l+roe r ul II, ....I.. . •,,,, ,I h, Ihi,k fihetglasrs linear. All hits arc marked on U,, <br /> � flo,,l t,t1h tt h,n i Lie Iv.i� I,niut .ni.I ,I. i.ul„I ..rt tiScj!>xchc<l tlonrdrawing- <br /> o- r-4- Kr,, nnrn n,l.u, n. Rr„ Hurn ml „ A more thorough MFI.%can and r-4- <br /> `< \ I I <br /> Cl) <br /> v T III \1 I:, r ON'Itt'tlttl 4 , �!• � J <br /> n �Vfit. Ito rII()NI IN'II-YI(W1.1OORPLA II <br /> �J cn I ittr Itcm e, l ( hey k I'M Ie•infurcnw, pn,ls under,,ll In,ll ,lll nll;u h �I ..III's,� c k and supports. 0 <br /> ,�nthtuon:utd onrtncnts: Striker platc" for the 1ff. Ic) ,, nlc, hanit.,,l vaottutn bi4alCer and under O <br /> ( s:llnple ealwc sc etc Installed un tot,of tllc lu,cal t iUI art a�IhcsIO-The WAOive has <br /> (D deteriorated and [lie striker plates arc loose. <br /> I:ecomnrendations: Recommend cleaning the existing adhesive off of the linear arul to ec plat_, <br /> then re-attaching the striker plates to the linear with an approved adhesiv9-for gast r1w servtCe. CD <br /> I7 ISM 19: COND CODE: 4 <br /> W Section 3.5.6 -- BOTTOM INTERIOR FLOOR I'I,A'MS 3 <br /> C Line item 3.5.6.q:Inspect coating for holes,on the bottom that does not drain adequately. <br /> C_ Condition and comments: The existing fiberglass linear appears to be in good condition with no <br /> e—+ Visible cracks or holes. <br /> Recormnendadons: Recommend spark testing 100%of the fiberglass linear system to assure no <br /> __N holidays are present- <br /> (D <br /> resent.O ITEM 20: COND CODE: 5 N <br /> O Section 4.1.9--FLOATING ROOF DECK <br /> Line item 4.1.9.d: On flat bottom and cone bottom roof decks,check for a vapor dam around the <br /> pperiphery of the roof. The dam should be continuous without break to prevent escape of vapors to <br /> O <br /> o the seal area from under the center of the roof O <br /> N 3 Condition and comments: No vapor dam installed around the perimeter of the IFR. <br /> (D Recotnrnendations: Consider installing a Vapor dam to the underside of the IFR around the p <br /> ifrequired. <br /> ITEM 21:COND CODE: 4 <br /> r--t- Section 4.2.1'A --SAMPLE HATCH (GAUGE HATCH) (APL' 0.1.5.1) <br /> O Line item 4.2.t.d: On floating roof sample hatch and recoil systems, inspect operation of recoil re Cn <br /> :3 and condition ofrope. <br /> W Condition and comments: No reel installed. Chain is in good condition.Chain was found to be <br /> wrapped around the,hinge which prohibited operation to open ar.4-Plose thehatch from the fixed <br /> roof. <br /> Recommendations:'Recommend re-designing the way you open and close th� Fle hatch.,on t 0 <br /> O IFR from the fixed roof to avoid future failure of this system. <br /> 0 <br /> ITEM 22: COND CODE:4 <br /> CD <br /> Section 4.2.17.1 -- VACUUM BREAKERS (AUTO-BLEEDER, LANDING-ACTUATE I.11�?-\ 1 <br /> o VALVE) (API: C.1.5.11) <br /> Line item 4.2.1 T Ld: Inspect for signs of'corrosion or other defects. <br /> s✓ <br /> 0 <br /> sv � <br /> IF-Iry ITIM14 O <br /> C) ONFIDENTIAI. I' <br />