|
� tTI
<br /> 11m;inspection revealed 3; MI-1.indreuuun,
<br /> I In:II lr t„ 1 1 l+roe r ul II, ....I.. . •,,,, ,I h, Ihi,k fihetglasrs linear. All hits arc marked on U,,
<br /> � flo,,l t,t1h tt h,n i Lie Iv.i� I,niut .ni.I ,I. i.ul„I ..rt tiScj!>xchc<l tlonrdrawing-
<br /> o- r-4- Kr,, nnrn n,l.u, n. Rr„ Hurn ml „ A more thorough MFI.%can and r-4-
<br /> `< \ I I
<br /> Cl)
<br /> v T III \1 I:, r ON'Itt'tlttl 4 , �!• � J
<br /> n �Vfit. Ito rII()NI IN'II-YI(W1.1OORPLA II
<br /> �J cn I ittr Itcm e, l ( hey k I'M Ie•infurcnw, pn,ls under,,ll In,ll ,lll nll;u h �I ..III's,� c k and supports. 0
<br /> ,�nthtuon:utd onrtncnts: Striker platc" for the 1ff. Ic) ,, nlc, hanit.,,l vaottutn bi4alCer and under O
<br /> ( s:llnple ealwc sc etc Installed un tot,of tllc lu,cal t iUI art a�IhcsIO-The WAOive has
<br /> (D deteriorated and [lie striker plates arc loose.
<br /> I:ecomnrendations: Recommend cleaning the existing adhesive off of the linear arul to ec plat_,
<br /> then re-attaching the striker plates to the linear with an approved adhesiv9-for gast r1w servtCe. CD
<br /> I7 ISM 19: COND CODE: 4
<br /> W Section 3.5.6 -- BOTTOM INTERIOR FLOOR I'I,A'MS 3
<br /> C Line item 3.5.6.q:Inspect coating for holes,on the bottom that does not drain adequately.
<br /> C_ Condition and comments: The existing fiberglass linear appears to be in good condition with no
<br /> e—+ Visible cracks or holes.
<br /> Recormnendadons: Recommend spark testing 100%of the fiberglass linear system to assure no
<br /> __N holidays are present-
<br /> (D
<br /> resent.O ITEM 20: COND CODE: 5 N
<br /> O Section 4.1.9--FLOATING ROOF DECK
<br /> Line item 4.1.9.d: On flat bottom and cone bottom roof decks,check for a vapor dam around the
<br /> pperiphery of the roof. The dam should be continuous without break to prevent escape of vapors to
<br /> O
<br /> o the seal area from under the center of the roof O
<br /> N 3 Condition and comments: No vapor dam installed around the perimeter of the IFR.
<br /> (D Recotnrnendations: Consider installing a Vapor dam to the underside of the IFR around the p
<br /> ifrequired.
<br /> ITEM 21:COND CODE: 4
<br /> r--t- Section 4.2.1'A --SAMPLE HATCH (GAUGE HATCH) (APL' 0.1.5.1)
<br /> O Line item 4.2.t.d: On floating roof sample hatch and recoil systems, inspect operation of recoil re Cn
<br /> :3 and condition ofrope.
<br /> W Condition and comments: No reel installed. Chain is in good condition.Chain was found to be
<br /> wrapped around the,hinge which prohibited operation to open ar.4-Plose thehatch from the fixed
<br /> roof.
<br /> Recommendations:'Recommend re-designing the way you open and close th� Fle hatch.,on t 0
<br /> O IFR from the fixed roof to avoid future failure of this system.
<br /> 0
<br /> ITEM 22: COND CODE:4
<br /> CD
<br /> Section 4.2.17.1 -- VACUUM BREAKERS (AUTO-BLEEDER, LANDING-ACTUATE I.11�?-\ 1
<br /> o VALVE) (API: C.1.5.11)
<br /> Line item 4.2.1 T Ld: Inspect for signs of'corrosion or other defects.
<br /> s✓
<br /> 0
<br /> sv �
<br /> IF-Iry ITIM14 O
<br /> C) ONFIDENTIAI. I'
<br />
|