My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2700
>
2800 - Aboveground Petroleum Storage Program
>
PR0527774
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2019 1:14:53 PM
Creation date
9/27/2018 4:48:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0527774
PE
2834
FACILITY_ID
FA0007644
FACILITY_NAME
BET STOCKTON TERMINAL
STREET_NUMBER
2700
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14503009
CURRENT_STATUS
01
SITE_LOCATION
2700 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M <br /> CD � <br /> vn <br /> o <br /> w rm~ <br /> - <br /> n `V 1.2 Period Until Next External UT Insl)ectiun <br /> ch <br /> ZJ �+ <br /> rF " O <br /> T <br /> V <br /> \V <br /> �'^� The calculated inspection interval is 9.21 years Based on the calw,ater. ;; <br /> V, thickness inspection shall be conducted on or before Der:31, 2016. Th s <br /> Plate Thickness from course number 2. <br /> Per AP1 653 ser!,0n 6 3.3' E y ra UT 1' :. Z3 <br /> rt— <br /> 7.3 Period Until Next External Inspection — <br /> RCA�'. <br /> rn� <br /> V Difference between the measur- '_ e <br /> nRCA= minimum required thickness 1n r.c-e: N <br /> �'= Shell corrosion rate in laches per jea- <br /> CQ O The minimum acceptable lhlrknes> = <br /> CD E3 L-_= calculated from API 6534,3.3, <br /> J than 0,100 inches for any tank course O <br /> O A! = The minimum measured shell plate thir'rness n == <br /> N <br /> N <br /> I RGA 006-1 hn.J <br /> M„ 0 310 (1n i <br /> 0247 (in.) <br /> N 0003 fin.) <br /> rF- <br /> -' <br /> Based on the calculated interval,the next external <br /> The calculated inspection interval is 4 60 years. ! <br /> 0 inspection shall be conducted on or before May 24, 2012. This interval is based on the f.1.nimum�hc °''= (n <br /> �� <br /> Thickness from course number 2. <br /> "' Per API 653 secLr,r r, 5 2 1 the External Inspection n?erval shall not exceeC 5 year`- <br /> ; <br /> rF- <br /> p <br /> O <br /> O <br /> C/) <br /> CD rt— <br /> O <br /> C— U) <br /> C <br /> O <br /> v ^ <br /> v °q. rF• <br /> O1enkRaporter O <br />
The URL can be used to link to this page
Your browser does not support the video tag.