My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2010
>
2900 - Site Mitigation Program
>
PR0543491
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2018 9:14:48 AM
Creation date
9/28/2018 9:12:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0543491
PE
2955
FACILITY_ID
FA0003557
FACILITY_NAME
BLOOM CONSTRUCTION CO
STREET_NUMBER
2010
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13336038
CURRENT_STATUS
02
SITE_LOCATION
2010 W FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NCharles H. Bloom Company Inc . <br />July 21, 1988, 11911 <br />Page 2. <br />C. Enseco Incorporated, California Analytical Laboratory - <br />Sacramento., California <br />4. -- The EPA Test Methods to 'be used for testing will be: <br />EPA Test Method <br />Test Name Water/Soil, <br />Total Petroleum Hydrocarbons. Modified 615/8015 -Ctv-D <br />( gasoline) ,. including- B T:XE oz� <br />Total .Petroleum Hydrocarbons Modified 615/8015 <br />(diesel) <br />5. Two options are considered .available for stockpiling soil removed <br />f from the excavation. <br />a. Stockpile on. asphaltic pavement and cover with ' plastic if <br />necessary.. <br />b. Return. to excavation after sampling is completed. <br />6. Water purged. from the excavation ' will be placed in a storage <br />tank ( "Baker Tank") at. the site.. <br />7. Upon receipt of the: chemical testing. results we -will provide (to <br />the owner../client) consultation as to the proper method of <br />disposal for both the water - and soil. <br />8. The report -of our test .results will include a description of the <br />work. performed, brief description of the: site conditions and <br />history, and a description of the observed soils , and the depths. <br />9. We understand that the Local Health District requires written <br />approval of the Work Plan. and addendum from the Central Valley <br />Regional Water Quality Control Board. <br />10. The tentative schedule for the field work to begin is August 1, <br />1988. - <br />Koldveer Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.