Laserfiche WebLink
F. In -Tank Gauging / SIR Equipment: ® Check this box if tank gauging is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Comnlete the following checklist: <br />❑ Yes <br />❑ No* <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />❑ Yes <br />❑ No* <br />Were all tank -gauging probes visually inspected for damage and residue buildup? <br />❑ Yes <br />❑ No* <br />Was accuracy of system product level readings tested? <br />❑ Yes <br />❑ No* <br />Was accuracy of system water level readings tested? <br />❑ Yes <br />❑ No* <br />Were all probes reinstalled properly? <br />❑ Yes <br />❑ No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />- to the Jectlon H, neiow, aescrine now ana when these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): <br />Comnlete the following checklist: <br />❑ Check this box if LLDs are not installed. <br />® Yes <br />❑ No* <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br />Serial Number <br />❑N/A <br />Check all that apply) Simulated leak rate: ®3 .h. [10. 1 .h ; [:10.2 .h. <br />❑ Yes <br />® No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />® Yes <br />❑ No* <br />Was the testing apparatus properly calibrated? <br />® Yes <br />❑ No* <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />❑ N/A <br />LD -2000 <br />El Yes <br />Ll No* <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />DIESEL (SOUTH) <br />® N/A <br />7011359 <br />❑ Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />® N/A <br />or disconnected? <br />❑ Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br />® N/A <br />malfunctions or fails a test? <br />❑ Yes <br />❑ No* <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />® N/A <br />® Yes <br />❑ No* <br />_ <br />I Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />H. Comments: <br />LD <br />Product Grade <br />Model <br />Serial Number <br />Pass/Fail <br />1 <br />DIESEL (NORTH) <br />FX -IV <br />1408 <br />FAL`: <br />2 <br />DIESEL (SOUTH) <br />FX -IV <br />9574 <br />FAIL* <br />DIESEL (NORTH) <br />LD -2000 <br />7011360 <br />PASS <br />DIESEL (SOUTH) <br />LD -2000 <br />7011359 <br />PASS <br />-- BOTH NORTH AND SOUTH LEAK DETECTORS WERE REPLACED <br />Page 3 of 3 <br />Monitoring System Certification <br />