Laserfiche WebLink
Monitoring System Certification <br />UST Monitoring Site Plan <br />Site Address: 1524 FRESNO AVENUE STOCKTON CA 95206 <br />L'J..........I....... <br />........................ <br />. . . . . . . . . CAR WASH . . . . . . <br />. . . . . . . . . . . . . . . . <br />. . . . . . . . . . . . . . . <br />..................................................... <br />.......................................... <br />..................................................... <br />I . . . . . . .VAPOR - <br />. . . <br />. . . . . . . . <br />. . <br />. . . . <br />. . . . . . . <br />. . . . . . . <br />. .MONITOR . <br />. . . . . <br />. . . . . <br />I <br />Hj . . <br />. . . . . . <br />. . . . . . . <br />.......... <br />. . .PIPING <br />. . . . <br />. . . <br />.(2). <br />- . ANNULAR. <br />. . <br />............ FILL - <br />.O. . <br />. . . TURBINE • <br />......VENT <br />• <br />• 0 . . . <br />. . . .ATG <br />Date map was drawn: <br />Instructions <br />If you already have a diagram that shows all required information, you may include it, rather than this page, with your Monitoring System Certification. On <br />your site plan, show the general layout of tanks and piping. Clearly identify locations of the following equipment, if installed: monitoring system control <br />panels; sensors monitoring tank annular spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line <br />leak detectors; and in -tank liquid level probes (if used for leak detection). In the space provided, note the date this Site Plan was prepared. <br />Monitoring System Certification <br />Page 4 of 4 <br />12/07 <br />1 2/21/07 <br />