My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2050
>
3500 - Local Oversight Program
>
PR0543791
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2018 2:25:50 AM
Creation date
9/28/2018 11:45:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0543791
PE
3526
FACILITY_ID
FA0003592
FACILITY_NAME
Aries Tek, LLC
STREET_NUMBER
2050
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
St
City
Stockton
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
2050 E Fremont St
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
313
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'd . R SYSTEMS TEL : 714 - 82t) - Sr4b �' G <br /> CONTINUED CONDITIONS FOR N-38-21 -2 Page: 2 <br /> 9 - Total emissions from the vR Systems soil remediation equipment (VR-3), shall not exceed the following <br /> limits duringan single day: NOa = 3 .51bs/day; CO = 8.0lbs/day; S = 2 . 1 lbs/day; PM10 <br /> ]baldly andC(Nonmethahe) = 4 .0 lba/day . <br /> 10 - The amoral emissions of an affected pollutant from all emissions units associated with <br /> deoantantination project shall not exceed (2) two tions per year. <br /> 11 - The permittee shall make provisions for laboratory samples to be taken at the time of the initial <br /> inspection under the supervision of the Air Pollution Control Inspector: Samples shall be taken at <br /> locations both upstream and downstream of the system. <br /> 12 - Samples shall be analyte laboratory TP1 and BT1EX. FFmors shall be taken <br /> en f from <br /> the same by the Districting ports <br /> immediately following rY D Laboratory <br /> prior to commencing system operation . <br /> 13 - The influent hydrocabon concentration and emissions from the VR Systems soil remediation equipment <br /> (VR-3)7 shall be measured daily for the first week of operation and once per week thereafter. <br /> 14 - A weekly log indicating the measured daily, weekly and cumulative influent hydrocarbon Concentrations <br /> and emissions shall be maintained and made available for District inspection upas request. <br /> 15 A weekly log indicating the operating hours of the soil decontamination system and fuel usage shall <br /> be !rept on the premises and all be made available for District inspection upon request, <br />
The URL can be used to link to this page
Your browser does not support the video tag.