Laserfiche WebLink
i <br /> ,..n. <br /> mcon <br /> 1433 North Market Boulevard Sacramento C,alrfornia 95834- 1943 • (916) 928-3300 • Fax (916) 928-3341 <br /> March 28, 1997 <br /> Project 22611 - 100.001 <br /> Mr. Lawrence Beasley <br /> Apache Plastic, L.P. <br /> 2050 East Fremont <br /> Stockton, California 95205 <br /> Re: Request for Change Order, Apache Plastic Facility, located 2050 East Fremont <br /> Street, Stockton, California <br /> Dear Mr. Beasley: <br /> EMCON is requesting additional funds for a soil investigation performed at the subject site. <br /> Due to site conditions (very stiff drilling encountered using the limited access rig), extent of <br /> hydrocarbons warranting the installation of one additional vapor extraction well in one of <br /> the boring, additional time and materials were incurred from the drilling contractor and <br /> EMCON personnel. Costs for soil disposal were not included in our original cost estimate; <br /> therefore, additional costs were incurred for disposal of soil. The additional scope of work <br /> was approved by the San Joaquin County Public Health Services (SJCPHS). The attached <br /> table provides a detailed breakout of the cost incurred to perform the additional work. <br /> Upon review and approval of this change in scope and the associated costs of $3 ,770.49, <br /> please indicate your approval by signing both originals of the attached signature page. <br /> Return one fully executed original for our files and retain the other for your records. <br /> In addition, the original proposal included costs for preparation of a Tier 1 and Tier 2 risk <br /> based corrective action plan (RBCA). EMCON began preparation of the RBCA <br /> evaluation, however, based on the analytical data obtained during the subsurface <br /> investigation and conversations with the SJCPHS , it was determined that preparation of a <br /> RBCA may not fully satisfy the closure committee. Therefore, EMCON did not complete <br /> the RBCA evaluation report. It was determined that a site closure report would be <br /> prepared and submitted for regulatory review. <br /> SAC\N:\PJT2611\26111000. IAB-95\lIb:l <br />