Laserfiche WebLink
TO: MARK RENIUO <br /> FROM: Doug Wilson, Supervising R.E.H.S. <br /> DATE: April 10, 1997 <br /> RE: 1789 FRESNO AVE LIST OF ITEMS TO BE PROVIDED PRIOR TO APPROVAL OF PLANS <br /> THE FOLLOWING MUST BE PROVIDED: <br /> 1. LACK OF ENGINEER STAMP AND SIGNATURE FOR TANK FLOAT CALCULATION <br /> 2. NEEDS KIND AND MODEL NUMBER OF FX1 <br /> 3. NEEDS THE LOCATION OF GILBARCO EMC ON PLAN <br /> 4. NEEDS THE EMC MODEL NUMBER ETC. <br /> 5. NEEDS TO SHOW STRIKER PLATE AT THE TANK OPENINGS OR ADD STATEMENT <br /> 6. PAGE 8 OF APPLICATION MUST BE FILLED OUT <br /> 7. NEEDS TO SHOW IF THE MONITORING SYSTEM IS ON ANOTHER PROPERTY--- THIS COULD NOT <br /> BE PERMITTED. <br /> 8. NEEDS A DIAGRAM OF PRODUCT LINES AT THE TANK SUMP. NONE SHOWN <br />