My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2050
>
3500 - Local Oversight Program
>
PR0543791
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2018 10:39:45 AM
Creation date
9/28/2018 3:07:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0543791
PE
3526
FACILITY_ID
FA0003592
FACILITY_NAME
Aries Tek, LLC
STREET_NUMBER
2050
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
St
City
Stockton
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
2050 E Fremont St
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 1 <br /> WELL CONSTRUCTION DETAILS <br /> Former Apache Plastics <br /> 2050 East Fremont Street, Stockton , California <br /> WELLS DESTROYED <br /> Well ID Installation Date Destruction Date Total Depth (feet bsg) Screen Interval (feet bloc) <br /> MW-1 08-28-1989 05-04-1992 72 46.5 to 66.5 <br /> MW-3 09-26-1989 unknown 69 46.5 to 66. 5 <br /> MW-12 03-09-2001 unknown 115 100 to 115 <br /> Notes: <br /> MSL: mean sea level MW: ground water monitoring well EW: Ground water extraction well <br /> bsg: below surface grade VEW: vapor extraction well <br /> btoc: below top of casing <br /> 1 : Survey completed by Hunter Surveying, Inc. of Cameron Park, California on 08 June 2006 via elevation datum NAVD88 and coordinate datum NAD83, CCS83, epoch date: <br /> 2: Vapor extraction well built open-ended with blank casing extending to 32 feet bsg. <br /> 3: Vapor extraction well built open-ended with blank casing extending to 65 feet bsg. <br /> 4: Survey completed by Morrow Surveying of Sacramento, California on 15 April 2008 via elevation datum NAVD88 and coordinate datum NAD83, CCS83, epoch date: 2002.86. <br /> Advanced GeoEr vironmental, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.