My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2050
>
3500 - Local Oversight Program
>
PR0543791
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2018 10:39:45 AM
Creation date
9/28/2018 3:07:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0543791
PE
3526
FACILITY_ID
FA0003592
FACILITY_NAME
Aries Tek, LLC
STREET_NUMBER
2050
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
St
City
Stockton
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
2050 E Fremont St
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LOG OF EXPLORATORY BORING <br /> PROJECT NUMBER 2611- 100 001 BORING NO CB1/VEW2 <br /> • PROJECT NAME Apache Plastics, 2050 E Fremont, Stockton, California PAGE 1 OF 3 <br /> BY C Avila DATE 10/23/96 SURFACE ELEV — 19 oft <br /> RECOVERY PID PENETRA - rn LITHO- WELL <br /> TION ?WW F J GRAPHIC DESCRIPTION DETAII <br /> M¢LLit W� E COLUMN <br /> ( ft/ft ) ( Ppm) (btus/ ft ) to _j i cc <br /> CONCRETE <br /> CLAYEY SILT (ML), moderate yellowish brown, <br /> non plastic, dry <br /> 1 4/ 1 5 0 04 ' as above, very stiff, no hydrocarbon odor <br /> 30 5 <br /> • <br /> 1511 5 0 @9 ' as above, hard, no hydrocarbon odor <br /> 61 t0 <br /> 1 4/ 1 5 0 p14' as above, trace fine-grained sand <br /> 95 15 <br /> i <br /> SILTY SAND (SM), moderate yellowish brown , <br /> line-grained sand, very dense, dry , no <br /> 1 5/ 1 5 3 1 : 1 hydrocarbon odor <br /> 20 <br /> REMARKS <br /> . Boring dulled using 8 inch diameter connnuous-flight hollow-stem auger drilling equipment and sampled with a <br /> modified California split-spoon sampler Boring convened to a 2-inch diameter vapor extraction well See Well Details <br /> sheet for well construction information <br /> E ON <br />
The URL can be used to link to this page
Your browser does not support the video tag.