My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2050
>
3500 - Local Oversight Program
>
PR0543791
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2018 3:20:21 AM
Creation date
9/28/2018 4:04:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0543791
PE
3526
FACILITY_ID
FA0003592
FACILITY_NAME
Aries Tek, LLC
STREET_NUMBER
2050
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
St
City
Stockton
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
2050 E Fremont St
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
h <br /> w <br /> I , <br /> I <br /> MONITORING AND REPORTING PROGRAM ORDER NO, R5-2008-0149-XXX 6 <br /> k APACHE PLASTICS (Former) <br /> SAN JOAQUIN COUNTY <br /> i <br /> DISCHARGE MONITORING <br /> 4, The Discharger shall record all H2O2 liquid injection , with information regarding the time <br /> period over which each amendment was injected into the aquifer, injection concentrations , <br /> and volumes of amendments . <br /> REPORTING <br /> 5 . When reporting the data , the Discharger shall arrange the information in tabular form so that <br /> the date , the constituents, and the concentrations are readily discernible. The data shall be <br /> summarized in such a manner as to illustrate clearly the compliance with this Order. The <br /> results of any monitoring done more frequently than required at the locations specified in the <br /> Monitoring and Reporting Program shall also be reported to the Regional Board . <br /> 6. As required by the California Business and Professions Code Sections 6735 , 7835 , and <br /> 7835 . 1 , all reports shall be prepared by a registered professional or their subordinate and <br /> signed by the registered professional . <br /> 7 . The Discharger shall submit quarterly electronic data reports , which conform to the <br /> requirements of the California Code of Regulations , Title 23 , Division 3 , Chapter 30 . The <br /> quarterly reports shall be submitted electronically over the internet to the Geotracker <br /> database system by the 30th day of the month following the end of each calendar quarter, <br /> 30 April, 30 July, 30 October, and 30 January, until such time as site conditions and <br /> Regional Board staff determine that modification to the reporting requirements are <br /> applicable. And , hard copies of quarterly reports shall also be submitted to the Board by the <br /> 30th day of the month following the end of each calendar quarter. Each quarterly report <br /> shall include the following minimum information : <br /> a) a description and discussion of the groundwater sampling event and results , including <br /> trends in the concentrations of pollutants and groundwater elevations in the wells, how <br /> and when samples were collected , and whether the pollutant plume(s) is delineated <br /> b) field logs that contain , at a minimum , water quality parameters measured before , during , <br /> and after purging , method of purging , depth of water, volume of water purged , etc. <br /> c) groundwater contour maps for all groundwater zones <br /> d) pollutant concentration maps for all groundwater zones <br /> e) cumulative data tables containing the water quality analytical results and depth to <br /> groundwater <br /> f) a copy of the laboratory analytical data report, which may be submitted in an electronic <br /> format <br /> g) the status of any ongoing remediation , including an estimate of the cumulative mass of <br /> pollutant removed from the subsurface , system operating time , the effectiveness of the <br /> remediation system , and any field notes pertaining to the operation and maintenance of <br /> the system <br />
The URL can be used to link to this page
Your browser does not support the video tag.