Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
-, Based on is , above conclusions, RS recommends: <br /> Operation of the pilot system as the full scale vapor extraction system. Continuous <br /> operation of the system would achieve a measure of clean-up <br /> e addiional <br /> information upon which to base design changes once soil can up levels havek <br /> cbeen <br /> established by the regulatory agent, <br /> o No air injection wells be installed at this time. I <br /> t <br /> o <br /> Carbon continue to be used for air polIuii:In control. Additional beds may need to ' <br /> be added to facilitate continuous operation of the system. <br /> Confirmation soil borings be drilled after six months of operation. <br /> i <br /> 0 Regulatory cleanup levels and time-frame be established after receipt of soil boring <br /> analytical results. g <br /> S <br /> ..r <br /> REMEDIATION <br /> SEAVICES. INC. <br />