My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0011212
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2050
>
3500 - Local Oversight Program
>
PR0543791
>
ARCHIVED REPORTS XR0011212
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2018 4:02:53 AM
Creation date
9/28/2018 4:20:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS XR0011212
FileName_PostFix
XR0011212
RECORD_ID
PR0543791
PE
3526
FACILITY_ID
FA0003592
FACILITY_NAME
Aries Tek, LLC
STREET_NUMBER
2050
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
St
City
Stockton
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
2050 E Fremont St
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONDITIONS FOR N- 38-21-3 • Page 2 <br /> 8 The total CO emission rate from the soil remediation system served by the internal combustion engine <br /> shall not exceed 10 28 lb/MMBtu <br /> *The total VOC emission rate from the soil remediation system served by the internal combustion engine <br /> shall not exceed 16 pounds in any one day <br /> 10 Ether the overall V OC control efficiency shall not be less than 95%, or the total V OC emission rate <br /> shall not exceed 2 pounds in any one day <br /> 11 The total VOC emission rate shall not exceed 10 tons in any one calendar year <br /> 12 Laboratory samples shall be taken at the initial inspection under the supervision of the APCD <br /> Inspector Samples shall be taken from both the influent and the effluent gas stream sampling ports <br /> 13 Laboratory samples shall be analyzed for TPH and BTEX <br /> 14 Sampling ports adequate for extraction of grab samples, measurement of gas flow rate, and use of an <br /> FID, PID, or other Distnct-approved VOC detection device shall be provided for both the influent and <br /> the effluent gas streams <br /> 15 Measurements to determine the influent and the effluent gas flow rates shall be taken at the initial <br /> inspection <br /> 16 Initial compliance with VOC emission rate and control efficiency requirements shall be demonstrated by <br /> the results of the laboratory samples analysis The results shall be submitted to the District <br /> within 60 days of the test <br /> 17 Operation of the soil remediation system shall not exceed one(1) year without prior District approval <br /> 0 <br /> ar <br />
The URL can be used to link to this page
Your browser does not support the video tag.