My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0011234
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2050
>
3500 - Local Oversight Program
>
PR0543791
>
ARCHIVED REPORTS XR0011234
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2018 4:27:25 AM
Creation date
9/28/2018 4:30:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS XR0011234
FileName_PostFix
XR0011234
RECORD_ID
PR0543791
PE
3526
FACILITY_ID
FA0003592
FACILITY_NAME
Aries Tek, LLC
STREET_NUMBER
2050
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
St
City
Stockton
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
2050 E Fremont St
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. Date November 19, 2002 <br /> APACHE PLASTICS QUARTERLY GROUNDWATER MONITORING REPORT <br /> Facility Address 2050 East Fremont Street, Stockton, California <br /> Project Supervisor Larry Beasley <br /> Consulting Co/Contact Person Stratus Environmental, Inc /Jay Johnson <br /> Consultant Project No 2005-2050-01 <br /> Primary Agency/Regulatory ID No Lori Duncan 1 San Joaquin County Public Health Service <br /> WORK PERFORMED THIS QUARTER (Third 2002) <br /> 1 Groundwater samples were collected from wells VIEW-1, VEW-2, and MW-2 through MW-12 on <br /> August 27, 2002 <br /> 2 Stratus compiled and evaluated groundwater monitoring data <br /> 3 Stratus submitted a Site Conceptual Model report (dated September 24, 2002) and a Work Plan <br /> Addendum (dated October 1, 2002) <br /> WORK PROPOSED FOR NEXT QUARTER(Fourth 2002) <br /> . 1 The next sampling event is tentatively scheduled for November 2002 Groundwater samples will be <br /> collected for laboratory analysis from wells VEW-1, VEW-2, and MW-2 through MW-12 <br /> 2 Upon receipt of regulatory approval, Stratus will begin implementing the additional environmental <br /> assessment and well abandonment activities outlined in the Work Plan for Additional Site <br /> Assessment(dated April 9, 2002)and Work Plan Addendum(dated October 1, 2002) <br /> Current Phase of Project Monitoring <br /> Frequency of Groundwater Sampling All Wells= Quarterly <br /> Frequency of Groundwater Monitoring Quarter) <br /> Groundwater Sampling Date August 27, 2002 <br /> Is Free Product(FP)Present on Site No <br /> FP Recovered This Quarter No <br /> Cumulative FP Recovered to Date NA <br /> Depth to Groundwater(upper zone) 48 48 to 50 71 feet below top of well casing <br /> Depth to Groundwater(lower zone) 49 96 to 53 95 feet below top of well casing <br /> Groundwater Flow Direction/Gradient(upper zone) Northeast;0 0013 ft/ft <br /> Groundwater Flow Direction/Gradient(lower zone)) East 10 04 ft/ft <br /> P\Apache Plastics\Quarterly repor s\20021newApache_3Q02 DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.