My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0011237
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2050
>
3500 - Local Oversight Program
>
PR0543791
>
ARCHIVED REPORTS XR0011237
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2018 4:42:09 AM
Creation date
9/28/2018 4:40:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS XR0011237
FileName_PostFix
XR0011237
RECORD_ID
PR0543791
PE
3526
FACILITY_ID
FA0003592
FACILITY_NAME
Aries Tek, LLC
STREET_NUMBER
2050
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
St
City
Stockton
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
2050 E Fremont St
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
n • <br /> y Mr Nuel Henderson, Jr, SJCEHD June 27,2005 <br /> Former Apache Plastics Facility, Stockton,CA Project No 2005-2050-01 <br /> Well Installation and Destruction Letter Report <br /> Page 3 <br /> locking cap was placed on the top of the well casing Well details and DWR well completion <br /> reports for each monitoring well are included in Appendix A <br /> Well Destruction <br /> Well MW-12 was pressure grouted with neat cement on March 30, 2004 The traffic rated <br /> vault box covering well MW-12 was removed, and the upper 3 feet of the well casing was <br /> overdrilled using an 8-inch diameter hollow stem auger The DWR well destruction notice <br /> for MW-12 is included in Appendix A <br /> Monitoring Well Development and Redevelopment <br /> Stratus oversaw Woodward Drilling Company redevelop well MW-8 on March 30, 2004 <br /> Well MW-8 was re-developed by surging and bailing Approximately 15 feet of sediment <br /> were removed from the well casing during re-development activities <br /> Stratus developed wells MW-15 through MW-18 on April 15, 2004 by surging with a plastic <br /> bailer, followed by groundwater pumping Stratus removed approximately 3 to 10 well casing <br /> volumes during well development activities Well MW-17 pumped dry during development <br /> activities Field data sheets documenting the development activities are provided in <br /> Appendix B <br /> Monitoring Well Sampling <br /> Wells MW-15 through MW-18 were incorporated into the ongoing monitoring program for the <br /> site during the second quarter 2004 Four sampling events have been completed to date Prior <br /> to sampling, approximately 3 well casing volumes were purged from each well Samples were <br /> collected from each well using a new plastic bailer The groundwater was subsequently <br /> transferred to laboratory supplied glass vials (voas) and stored in an ice-chilled cooler Strict <br /> chain-of-custody procedures were followed from the time the samples were collected until the <br /> time the samples were relinquished to the laboratory <br /> Waste Management <br /> Soil cuttings were stockpiled on, and covered with, plastic sheeting and stored onsite pending <br /> disposal Rinseate water generated during drilling was placed in DOT-approved 55-gallon <br /> steel drums and stored on-site pending disposal Integrated Wastestream Management of <br /> Milpitas, California, transported the soil cuttwg5 grid drummed wastewater to licensed facilities <br /> for disposal Stratus transported the other purged groundwater generated during the well <br /> development and sampling events to a licensed facility for disposal <br /> K\Apache Plastics\Reports\Apache-well-install-destruct-letter report doe <br />
The URL can be used to link to this page
Your browser does not support the video tag.