Laserfiche WebLink
} Mr Nuel Henderson,Jr, SJCEHD June 27,2005 <br /> • Former Apache Plastics Facility, Stockton, CA Project No 2005-2050-01 <br /> Well Installation and Destruction Letter Report <br /> Page 5 <br /> If you have any questions, please contact Jay Johnson at (530)676-6000 <br /> Sincerely, <br /> 5T12ATU5 ENVIRONMENTAL, INC <br /> S A <br /> Scott G B�61�� <br /> AyR son, R GProject Geologist nager <br /> cc Mr Larry Beasley, Beasley and Associates, L P <br /> Mr Marty Hartzell, California Regional Water Quality Control Board <br /> Attachments Table 1 Soil Analytical Results <br /> Table 2 Groundwater Analytical Results <br /> Figure 1 Site Location Map <br /> Figure 2 Site Plan <br /> Appendix A Well Details, Geologic Log, Well Installation and Destruction <br /> Permits, and DWR Well Completion and Destruction Notices <br /> Appendix B Field Data Sheets <br /> Appendix C Certified Analytical Reports and Chain-of-Custody <br /> Documentation <br /> K\Apache Plastics\Reports\Apache-well-install-destruct-letter report doc <br />