My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0011281
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2050
>
3500 - Local Oversight Program
>
PR0543791
>
ARCHIVED REPORTS XR0011281
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2018 5:27:01 AM
Creation date
9/28/2018 5:01:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS XR0011281
FileName_PostFix
XR0011281
RECORD_ID
PR0543791
PE
3526
FACILITY_ID
FA0003592
FACILITY_NAME
Aries Tek, LLC
STREET_NUMBER
2050
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
St
City
Stockton
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
2050 E Fremont St
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
91/01/1994 22 27 2095622812 APACHE PLASTICS 03 PAGE 01 <br /> 1433 North Market Boulevard•Sacramento CA 95834-1943•(916)926.3300•Fax(916)926-33'11 <br /> January 25, 1999 <br /> Proposal 92098-110 021 <br /> Mr Lawrence H Beasley <br /> 2120 Ptbble Drive <br /> Alamo, California 94507 <br /> Re Proposal and Cost Estimate for Soil Assessment <br /> Dear Mr Beasley <br /> At your request EMCON has prepared this scope of work and cost estimate to drill two <br /> soil borings for providing vertical delineation of soil and groundwater impacts at the <br /> Apache Plastics Facility located at 2050 East Fremont Street in Stockton, California <br /> EMCON submitted a Case Closure Report (July 17, 1997) that included estimates of <br /> remaining petroleum hydrocarbon mass in soil and groundwater and recommended cast <br /> closure under the low risk cntena After reviewing the report the San Joaquin County <br /> Department of Public Health Services Environmental Health Mvismon (PHS/EHD) <br /> requested additional delineation of soil and groundwater impacts <br /> SCOPE OF WORK <br /> Prior to implementing field activities, EMCON will submit a workplan and obtain <br /> drilling permits from the PHS/EHD and Conduct utility clearance The scope of work <br /> consists of two soil borings with continuous soil sampling from depths of 60 feet to lU0 <br /> feet bgs to evaluate the vertical extent of soil impacts HydroPunch groundwater samples <br /> will be collected at changes in lithology to evaluate the vertical extent of groundwalur <br /> impacts At the completion of the field work and once analytical results are receivers, <br /> EMCON will prepare a report of the findings and request case closure it warranted based <br /> upon the assessment results A summary of activities to be conducted under each task is <br /> presented below <br /> Task 1 - Prefleld Activities <br /> • submit workplan and drilling permits to PHS/EHD <br /> • schedule drilling contractor and materials <br /> CP IE V►rwcii4WOPosAi APACM]not 99Usg i <br /> 92M 210021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.