Laserfiche WebLink
01/0111994 22 27 2095622812 APACHE PLASTICS 03 PAGE 03 <br /> Y •r <br /> Mr Lawrence H Beasley Proposal 92098-1.10 021 <br /> January 25, 1999 <br /> Page 3 <br /> The estimated cost to perform iaboratvry analysts of samples is $4,796 00 <br /> Task 4- RtiRporUng <br /> • preparation and submittal of assessment report that includes <br /> -- methods used and assessment results <br /> - copies of boring logs and well details(if wells installed), and analytical <br /> reports <br /> - request case closure if warranted based upon findings <br /> The estimated cost for reporting is$1,26100 <br /> BUDaf!T <br /> The estimated cost for performing the proposed work is $17,156 00, excluding <br /> monitoring, wells, or $22,455 00, including monitoring wells (see Table) EMCON bills <br /> for time and materials, consistent with the attached Schedule of Charges Charges for <br /> work that is not part of the proposed scope of work are not included in the hudgct <br /> estimate <br /> The estimated cost and proposed scope of work are based on information available to <br /> EMCON at this time if conditions change, unforeseen circumstances are encountered, or <br /> work efforts are redirected,the cost estimate may require modification <br /> Sincerely, <br /> EMCON <br /> Mark Capps,:G 6561 Ajo� n, AG 5867Project Manager lett Supervisor <br /> Attachments Table Estimated Budget <br /> General Terms and Conditions <br /> Schedule of Charges <br /> Environmental Assessment Addendum <br /> cPI%E WAOM itoPvsp►t.WAC "i Doc Meg i a(mon <br /> smva 110 U21 <br />