Laserfiche WebLink
Jan-20-99 01 :35P Pinnacle/EMCON P.03 <br /> . Mr Lawrence H Beasley Proposal 92.098-110 021 <br /> November 18, 1998 <br /> Page 3 <br /> The estimated cost to perform laboratory analysis of samples is$4,796 00 <br /> Task 4 - Reporting <br /> • preparation and submittal of assessment report that includes <br /> — methods used and assessment results <br /> copies of boring lags and well details (if wells installed), and analytical <br /> reports <br /> — request case closure if warranted based upon findings <br /> The estimated cost for reporting is$1,26100 <br /> BUDGET <br /> The estimated cost for performing the proposed work is $17,156 00, excluding <br /> monitoring wells, or $22,455 00, including monitoring wells EMCON bills for time and <br /> materials, consistent with the attached Schedule of Charges Charges for work that is not <br /> part of the proposed scope of work are not included in the budget estimate <br /> I <br /> The estimated cost and proposed scope of work are based on information available to <br /> EMCON at this time If conditions change, unforeseen circumstances are encountered, or <br /> work efforts are redirected, the cost estimate may require modification <br /> Syyohn <br /> l <br /> G <br /> t Supervisor <br /> cc UST Cleanup Fund <br /> SCP lE 44YACHLTROPOSALV 11898 1700 WL59 1 Emcon <br /> 92099 110 02t <br />