Laserfiche WebLink
TABLE 1. Groundwater Elevation <br /> ' Project: Apache Plastics,Stockton,CA <br /> Well Casing Depth to <br /> ' Well ID# Date Measured Elevation Groundwater Elevation <br /> VE-I Deep 12/28/94 18.83 Dry ._ <br /> 2/16195 18.83 Dry <br /> ' 717/95 • 18.86 62.27 43.41 <br /> 9!7/95 18.86 Dry <br /> 12/14/95 18.86 57.65 -38.79 <br /> 2(20/96 18.86 59.60 40.74 <br /> ' 5123/96 18.86 57.49 38.63 <br /> 8/18/96 18.86 Not Measured <br /> l2/4/96 18.86 Not-Measured <br /> 3/12/97 18.86 Not Measured <br /> MW-2 12/28/94 18.75 Dry <br /> 2/16/95 18.75 65.73 46.98 <br /> ' 6/1/9$ 18.75 62.52 -43.77 <br /> 7!1/95 s 18.71 62.18 43.47 <br /> 917/95 18.71 63.67 X4.96 <br /> 12/14/95 18.71 61.68 -42.97 <br /> ' 2/20/96 18.71 58.48 39.77 <br /> 5/23/96 18.71 55.19 -36.48 <br /> 8128196 18.71 58.23 -39.52 <br /> 124196 18.71 55.92 37.21 <br /> 3/12/97 18.71 51.98 -33.27 <br /> MW-3 12/28/94 18.59 Dry <br /> ' 2116/95 18.59 Dry <br /> 611/95 18.59 62.20 43.61 <br /> 717/95 + 18.59 61.91 -43.32 <br /> ' 9/7/95 18.59 63.41 -44.82 <br /> 12/14/95 18.59 61.34 42.75 <br /> 2/20/96 18.59 58.36 39.77 <br /> ' 5/23/96 18.59 55.05 -36.46 <br /> 8128/96 18.59 57.74 -39.15 <br /> 1214/96 18.59 55.87 -37.28 <br /> 3/12/97 18.59 51.82 -33.23 <br /> ' MW4 12/28/94 17.23 65.49 -48.26 <br /> 2/16/95 17.23 64.13 -46.90 <br /> 6/1/95 17.23 60.97 -43,74 <br /> ' 717/95 * 17.21 60.71 -43.50 <br /> 9/7/95 17.21 62.18 -44.97 <br /> 12/14/95 17.21 60.16 42.95 <br /> 2/10/96 17.21 57.03 -39.82 <br /> 5/23/96 17.21 53.81 -36.60 <br /> 8/28/96 17.21 56.63 -39.42 <br /> 12/4/96 17.21 54.52 -37.31 <br /> 3/12/97 17.21 50.56 -33,35 <br />