Laserfiche WebLink
BOREHOLE LOG CPT-1 <br /> STRATUS Project No.: 2005-2050-01 Site: Fortner A ache Plastics Facility Drilling Com any: GreggIn Situ,Inc. <br /> 2050 East Fremont Street,Stockton, CA Driller: RU erto and Tor e <br /> Date: February 5,2001 Field Geologist: Scott Bittinger <br /> -Drilling Rig: CPT Dr Hing Method: CPT <br /> Borehole Diameter: 2 inches Soil Sample Equipment: 12-inch retractable <br /> Total De the 140 feet b s Water Sampjing Equipment: H dro unch M <br /> Well Completion Data <br /> Slotted Interval: Casing Material: <br /> Filter Pack Material: Casing Diameter: <br /> Seal Material: Slot Size: <br /> Backfill Material: Bentonite Cement <br /> Sample ID Depth Sample % Blow PID Soil Description:_ <br /> (€t.) Interval Rec. Count (ppm) Class. <br /> CPT1-42.5-5 42.5 42-43 100 0 ML CLAYEY SILT,light brown,damp, stiff <br /> CPT1-46-W 46 44-48 Water <br /> CPT1-62-W 62 60-64 Water <br /> CPT1-100-5 100 99-100 80 199 ML CLAYEY SILT,light brown,hard,dam <br /> 1-1 8-W 108 106-110 Water <br /> CPT1-120-W 120 118-122 Water <br /> CPT1-127-5 127 126=127 70 3 ML CLAYEY SILT, light brown,24%fine grained <br /> sand, moist r <br /> CPT1-132-W 132 130-134 Water <br /> CPT1-138-5 138 137-138 100 0 CL CLAY,low REcerita e of silt, light brown, dam <br /> I - <br />