Laserfiche WebLink
S _ _ SP001 Monthly Inspection Check. <br />Inspection Date: - I v ,,11_0 11 Retain Until Date- M� - ' y Z O (36 months from inspection date) <br />7 <br />Prior Inspection Date: -A 12 r r ZO 1 7 Inspector Name: FZ C'y C7 Y i, -i <br />Tanks Inspected (ID Ws): AST -8, AST -9 (Building 120) <br />Inspection Guidance: <br />For equipment not included in this Standard, follow the manufacturer recommended inspection/testing schedules and procedures. <br />Y The periodic AST Inspection is intended for monitoring the external AST condition and its containment structure. This visual inspection <br />does not require a Certified Inspector. It shall be performed by an owner's inspector who is familiar with the site and can identify changes <br />and developing problems. <br />> Upon discovery of water in the primary tank, secondary containment area, interstice, or spill container, remove promptly or take other <br />corrective action. Before discharge to the environment, inspect the liquid for regulated products or other contaminants and disposed of it <br />properly. <br />(*) designates an item in a non-conformance status. This Indicates that action is required to address a problem. <br />> Non -conforming items important to tank or containment integrity require evaluation by an engineer experienced in AST design, a Certified <br />Inspector, or a tank manufacturer who will determine the corrective action. Note the non-conformance and corresponding corrective <br />action in the comment section. <br />➢ Retain the completed checklists for 36 months. <br />In the event of severe weather (snow, ice, wind storms) or maintenance (such as painting) that could affect the operation of critical <br />components (normal and emergency vents, valves), an inspection of these components is required as soon as the equipment is safely <br />accessible after the event. <br />Item Task Status Comments <br />1.0 Tank Containment <br />1.1 Containment structure <br />Check for water, debris, cracks or fire hazard <br />7Yes" 50o !_'N/A <br />1.2 Primary tank <br />Check for water <br />Yes*'lo <br />1.3 Containment drain valves <br />Operable and in a closed position <br />Yes ",No*AN/A <br />1.4 Pathways and entry <br />Clear and gates/doors operable <br />idles _ 'No* ! : N/A <br />2.0 leak Detection <br />2.1 Tank <br />Visible signs of leakage <br />"-.Yes*4No <br />2.2 Secondary Containment <br />Visible signs of leakage from tank into secondary <br />containment <br />7Yes* L'Nd.QN/A <br />2.3 Surrounding soil <br />Visible signs of leakage <br />_Yes* 'NO2VA <br />2.4 Interstice <br />Visible signs of leakage <br />=iYesVo -N/A <br />3.0 Tank Equipment <br />3.1 Valves <br />a. Check for leaks. <br />Yes*XNo N/A <br />b. Tank drain valves must be kept locked. <br />,-Yes* `Noll/A <br />3.2 Spill containment boxes on fill <br />pipe <br />a. Inspect for debris, residue, and water in the box <br />and remove. <br />'Yes*><No N/A <br />b. Drain valves must be operable and closed. <br />:Yes* No 5o/A <br />3.3 Liquid level equipment <br />a. Both visual and mechanical devices must be <br />inspected for physical damage. <br />qes No* N/A <br />b. Check that the device is easily readable <br />5<es ',No* N/A <br />3.4 Overfill equipment <br />a. If equipped with a "test" button, activate the <br />audible horn or light to confirm operation. This <br />could be battery powered. Replace the battery if <br />needed <br />Yes No*�<N/A <br />b. If overfill valve is equipped with a mechanical test <br />mechanism, actuate the mechanism to confirm <br />operation. <br />?Yes No*>eQN/A <br />3.5 Piping connections <br />Check for leaks, corrosion and damage <br />Yes 4QNo <br />4.0 Tank Attachments and Appurtenances <br />4.1 Ladder and platform structure <br />Secure with no sign of severe corrosion or damage? <br />® Not Applicable <br />5.0 Other Conditions <br />5.1 Are there other conditions that should be addressed for continued safe operation or <br />that may affect the site spill prevention plan? <br />`�s1 <br />Yes *110 <br />