My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TILLIE LEWIS
>
1477
>
2800 - Aboveground Petroleum Storage Program
>
PR0523160
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2019 10:31:53 AM
Creation date
10/2/2018 11:28:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0523160
PE
2832
FACILITY_ID
FA0010602
FACILITY_NAME
WILLIAMS TANK LINES
STREET_NUMBER
1477
STREET_NAME
TILLIE LEWIS
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
16336003
CURRENT_STATUS
01
SITE_LOCATION
1477 TILLIE LEWIS DR
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
From:Williams Tank Lines 209 944 0134 05/15/2015 15:19 0551 P.003/004 <br /> f <br /> May 15,2015 s <br /> S.J.Environmental Health Dept. <br /> Atm. Stacy Rivera ! <br /> Re: Return To Compliance <br /> Ms. Rivera, <br /> My name is David Ray, and I am the Safety Director for Williams Tank Lines. After we discovered that the <br /> required responses had not yet been completed and sent in, I volunteered to work on them while Garth <br /> Williams was out. I brought in a consultant to help me understand what it is going to take to bring us back <br /> into compliance, so the following addresses each violation noted during you last inspection of our Stockton <br /> i <br /> facility. <br /> Item#301 CFR 112.5(a) Plan will be amended and updated by 5/20/2015 <br /> Item#302 CFR 112.5(b)Plan will be amended and updated by 5/20/2015 <br /> Item#613 CFR 112.7(e)Monthly inspection program will be re-initiated after training on 5/19/2015 , <br /> Item#614 CFR 112.7(f)(1)Training will be completed on 5/19/2015 <br /> Item#616 CFR 112.7(f)(3)Training will completed on 5/19/2015 <br /> Item#713 CFR 112.8(c)(6) Completed,See provided document of tank test performed. <br /> Item#717 CFR 112.8(c)(8)(v)Will be completed by 5/29/2015 <br /> Item #720 CFR 112.8(c)(11) Plan to be amended and updated for our Portable and Mobile containers and how <br /> we store them.Completion by 5/20/2015 <br /> Going forward, I will be employing the services of our consultant,Gary Reeves, on a more regular basis, and <br /> implementing procedures to monitor the responsibilities of our Shop manager (Garth Williams) regarding <br /> compliance of our Aboveground Petroleum Storage. If you have any questions regarding my responses,please <br /> don't hesitate to call. <br /> Thank You, <br /> David Ray <br /> Safety Director <br /> (209)944-5613 x 38 <br /> c[rav�illiamstanklines.cotp <br /> 1477 TILLIE LEWIS DR STOCKTON, CA - 95206 <br /> 11I-IONE: (800) 877-0213 EXT 38 - FAX: (800) 417-8036 <br /> DR.11'(!t>\\%1 I,1.1:\\1S'I'.1\K1.INIiS.00:1I <br />
The URL can be used to link to this page
Your browser does not support the video tag.