Laserfiche WebLink
ANNUAL AST INSPECTION CHECKLIST 1LV <br />i I Status <br />Inspection Item (circle one) Comments <br />_Tank Containment — <br />1L Costa _ment structure in good condiiio_n'� ES JO _NA -- - --- - -- - --- ----- ------------- <br />2) Containment Pipes valves in good 4 - —_— — -- --------- -- — <br />rnnditinn? NO NA <br />Tank Foundations/Su <br />orts <br />1) Is there any evidence of tank settlement or <br />foundation washout? <br />YES <br />N <br />NA <br />2) Is there any cracking or spalling of <br />mow C-.)-- <br />concrete ad or ringwall? <br />YES <br />O <br />NA <br />o a <br />3 Tank supports in good condition? <br />Y <br />NO <br />NA <br />a <br />4 Water drains away from tank? <br />E' <br />NO <br />NA <br />I� <br />5) Grounding strap secure and in good <br />condition? <br />YE <br />NO <br />NA <br />Cathodic Protection <br />1) Cathodic Protection system functioning <br />properly? <br />YES <br />N <br />NA <br />2 Rectifier reading? <br />Tank Condition <br />1 Evidence of paint failure? <br />YES <br />N <br />NA <br />2) Noticeable shell distortions (buckling, <br />bulging, denting)? <br />YES <br />NA <br />3 Evidence of shell cracking? <br />YE§(69)- NA <br />4) Flanged manway connection bolts fully <br />tightened with no sign of wear or <br />O <br />NA <br />corrosion? <br />Q"�'E <br />&SN <br />i <br />5 Standingwater on tank roof?O <br />NA <br />6) Evidence of coating, cracking, crazing, <br />peeling, or blisteringof tank roof? <br />YES <br />NA <br />7 Holes in roof? <br />YES NA <br />