My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
3400
>
2300 - Underground Storage Tank Program
>
PR0518738
>
INSTALL 2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2019 3:51:36 PM
Creation date
10/4/2018 9:44:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL 2003
FileName_PostFix
2003
RECORD_ID
PR0518738
PE
2361
FACILITY_ID
FA0014111
FACILITY_NAME
TRACY PETRO INC*
STREET_NUMBER
3400
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
21306016
CURRENT_STATUS
01
SITE_LOCATION
3400 MACARTHUR DR
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXTRACTOR FITTIN6wi <br /> 560 SERIES <br /> EXTRACTOR <br /> Installed on the vent line of an under- <br /> ground storage tank. Extractor allows <br /> vent lines to be manifolded and also <br /> allows removal of Float Vent Valve(Fig _ <br /> 317)for repair or replacement. It <br /> FIG 560 Various sizes available(listed on right). FIG 561 FIG 562 FIG 563 <br /> C.A.R.B.Approved All sizes are C.A.R.B. approved. C.A.R.B.Approved C A.R.B.Approved C.A.R.B.Approved <br /> FIG/SIZE WEIGHT <br /> CONSTRUCTION DETAILS <br /> Cast iron body(epoxy coated). Brass Fig 560-4"x 4'> 2" , 2" _ ...._..........._................._.18.25 7 <br /> cage and Buna-N O-ring. Fig 561 -4"x 4"x 2". .. ...._ ..._............. ....._.......__ 15 ".c: <br /> Fig 562-4"x 4"x 3"x 2".-.-.__..._........................................... 18.25 Ib= <br /> Fig563-4"x 4"x 3"_......--__...._............................................. 14.5 Ins <br /> 578 & 578 P 561 P <br /> E:X-R.ACTOR -ES- 7:: iG <br /> PIPE CAP <br /> Used as a cover for the Extractor/Float To seal a system when conducting a <br /> Vent Valve overfill system. Installed on tank tightness test on a tank equipec <br /> the riser pipe at grade level normally with the Extractor/Vent Valve overfill. <br /> inside a manhole. Test plug screws into the extractor fit- <br /> ting in place of the Float Vent Valve and <br /> is FIG 578 P-Same as Fig 578,but with remains for duration of the test. <br /> 3/8" NPT hole through top surface for J <br /> FIG 578 probe fitting. FIG 561 P <br /> C.A.R.e.Approved CONSTRUCTION DETAILS <br /> CONSTRUCTION DETAILS Brass body.Buna-N 0-Ring.&plated <br /> Brass cap. Buna-N gasket.. &plated steel pin (handle) <br /> steel pin(handle). <br /> SIZE WEIGHT SIZE WEIGHT <br /> 4' ..........__.. <br /> L.75 Ins <br /> 317 SERIES WARNING:The 317 series should not be used on suction pumpsystems. <br /> Overfill warning systems should only be used on gravity drop systems.Dc <br /> not use where pump off unloading is used. <br /> FLOAT VENT VALVE <br /> SIZE WEIGHT <br /> A main component of the Extractor/ 2"x 6"long nipple..................................................................... 2.25 Ids <br /> Float Vent Valve overfill prevention sys- 2"x12"long nipple _. ... 4.25 Ids <br /> tem(FIG560/317). InstalledonaUST "" ..." """" """""""""."' <br /> vent line. When filling a tank,the ball 2.x 15"long nipple .... .. 5 Ids <br /> ........................................ <br /> floats on the liquid and rises to the seat 2 x 1T ong nipple .. . .. ..... ...... .. .. 5.75 Ib- <br /> S c <br /> areaor,thepipenipple. The level of the 2 r -g, long iHpe .. _............... ..........................._.....6.5 lbs <br /> FIC i2") seal is set at the high level limit of the _- <br /> tank. Once seated, air flow becomesr 6"Ion nipple ppl (FIG 317 NPT)_... ......... . ... ... ..... r Ins <br /> restricted which abruptly reduces the <br /> filling rate&warns the operator to stop .0 ionion' s - <br /> filling the tank. 3' x t-,"long ropjp,t kFiG 3-.7 NPT - <br /> A 1/8"bleed hole is provided on the side 3-x 15"Iona n;pr nipple.................................................................16 lns <br /> of the nipple to allow the operator rp „ x 1 1/ on n` t <br /> g ....._._ .............. P, lb: <br /> ,., drain the transport hose into the tank "" - - - - ..... <br /> after the filling process has been-halted. CONSTRUCTION DETAILS <br /> Various nipple lengths are available 2•size-Epoxy coated steel pipe. Stainless steel float and cage <br /> (listed on right) <br /> spring. <br /> FIG 317(3") FIG 317 NPT-3"Float Vent Valve with 3"size-Epoxy coated steel pipe.Stainless steel float,brass adaptor, <br /> 3"male threads. (3 x6&3 x 11 only.) and Buna-N O-ring. <br /> 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.