Laserfiche WebLink
UST SYS+EM DRAWING INFORMATION <br /> 1. Three complete sets of plans(include manufacturer's specification sheets for proposed equipment to be installed). <br /> 2. Plans drawn to scale in non-erasable print. <br /> 3. ✓ Plot plan to show location of tanks and all associated piping. <br /> 4. Striker plates or drop tube-mounted bottom protectors illustrated below all accessible openings. <br /> 5. �� Tank cross-sectional diagram. <br /> 6. t/ Detail of tank,associated piping, excavation and cover. <br /> 7. �� Tank(s)and piping approved by a nationally recognized independent testing organization. [Title 23,Chapter 16, <br /> Article 3,Section 2631 (b)&26351 <br /> 8. f Verification of product compatibility with the tank(s),piping, monitoring <br /> device(s),epoxy or silicone glues,etc. <br /> 9. ✓ Manufacturer's written installation instructions for tank(s), piping,monitoring devices,etc. <br /> 10. At the installation site, prior to installation,a tightness test shall be performed on both primary(1°)and secondary <br /> (20)containment systems before covering. [Section 2635(a)(3)&(4)] <br /> 11. _� Tank integrity test required upon completion of installation with tank in operating condition. Test results to be <br /> submitted directly to EHD from the testing company or owner of facility. [Health&Safety Code, Division 20,Chapter <br /> 6.7,Section 25291 (h)] <br /> 12. TANK COMPOSITION G <br /> TANK# M O-7 A 91 ID # <br /> CAPACITY 20, 00-30J. ZO,000' a[ <br /> MANUFACTURERLD <br /> COMPOSITION Ft F"6AX <br /> MODEL <br /> Gq! C�Kelcw <br /> PRODUCT !J -7 45 'blesel <br /> 1 <br /> CORROSION �W -31 -DW-FCT <br /> PROTECTION <br /> LISTED / <br /> COMPATIBILITY <br /> WITH"1 0/, <br /> METHAN L <br /> 13. TANK(s)TO BE INSTALLED <br /> A. Steel-clad with fiberglass reinforced plastic coatings,composites,or equivalent non-metallic exterior <br /> coatings or coverings. <br /> (1) Tested at the installation site using an electric resistance holiday detector. <br /> (2) Vacuum applied to interstitial space. <br /> fB. Fiberglass <br /> 'Z (1) Installation instructions require an air test and soap bubble test prior to installation. <br /> , <br /> (2) Vacuum applied to interstitial space. <br /> (3) Hydrostatic annular(primary tank pressure test). <br /> 5 <br />