Laserfiche WebLink
_ AuwlR tic line leak detectors will.be installed on pressed piping <br /> Manufacturer: Model: <br /> Annual monitoring will be conducted on the pressurized piping with secondary containment. <br /> _ Annual line tightness test will not be required if the continuous monitor shuts down the pump and <br /> activates the alarm system when a release is detected and when the continuous monitoring <br /> / system falls or is disconnected. <br /> 20. ✓ State Water Resources Control Board"Facility(A)"and"Tank Permit(B)"application forms submitted. <br /> 21. Plan review and operating permit fees paid. <br /> 22. What is the approximate depth to ground water: LA [L <br /> (include source of information-borehole logs, monitoring well data,water <br /> studies,etc.) <br /> 23. c2 Total number of tanks on site after installation: <br /> 24. '� County/City Fire District and Building Department notified. <br /> 25. _✓ In the event contamination is observed,confirmed or suspected as a result of a leaking UST system it is your <br /> responsibility[in accordance with (CCR)Title 23, Division 3,Chapter 16,Article 11,Corrective Action Requirements] <br /> as an owner.or operator to submit a workplan to EHD Site Mitigation Unit prior to initiating any assessment or <br /> remediation activities. For further assistance contact the Site Mitigation Unit at(209)469-3450. <br /> //ff K//��//�,The owner or operator must acknowledge this responsibility four workplan submittal by signature and date below. <br /> Name((._ �P�t Title �.KNLs�"YC�C.C�.f� Date <br /> CONDITIONS OF APPROVAL: <br /> 9 <br />